JET used a laser to examine fuel left in its walls
A laser carried by MASCOT analysed around 840 locations inside JET. Spectroscopy, positioning and ex-situ validation reveal what it takes to measure retained fusion fuel.
Read the Japanese original
Some of the fuel used in JET remains in its walls. Must those walls be removed before it can be examined? In October 2024, researchers brought a laser into the vessel on a robot and analysed about 840 locations. A small flash of light addresses a large management problem for fusion machines.
Making a small plasma on the wall
In a fusion machine using deuterium and tritium, material eroded from plasma-facing surfaces can settle elsewhere. These deposits contain wall material, impurities and hydrogen fuel species. Radioactive tritium makes it important to understand where fuel accumulates, as well as how much was supplied.
Laser-induced breakdown spectroscopy, or LIBS, removes a tiny amount of surface material with a short laser pulse and analyses the light from the resulting plasma. Separating that light by wavelength provides information about elements and hydrogen isotopes. This is a locally ablative measurement, rather than a camera simply observing an untouched surface. The JET research report describes its application inside the vessel.
The receiving optics matter too
In preliminary measurements at VTT, an ENEA-developed laser and focusing-optics enclosure was linked to a spectrometer by a 20-metre optical fibre. Samples from JET limiters and divertors supported analysis and calibration of the ablation rate. That preliminary arrangement should be distinguished from the final in-vessel configuration.
The final JET setup included a high-resolution Littrow spectrometer to separate hydrogen-isotope lines, an Echelle spectrometer and photomultipliers. Shining a laser is only one step. Collecting the emission, separating it and relating the signal to material properties are part of the measurement system.
A robot determines where the measurement happens
The enclosure was mounted on JET's MASCOT manipulator and operated from a dedicated control room. Researchers successfully analysed approximately 840 locations on the main wall and divertor. The report also describes measurements of individual castellations on limiter tiles as a demonstration of positioning accuracy.
The same spectrometer pointed at a different spot measures a different surface. Robot positioning is therefore a measurement condition, alongside the optics. Its role includes matching the result to a recorded location. The accompanying MASCOT photograph shows a training facility, published in 2024, rather than the LIBS experiment in progress.
Checking in-vessel results against removed samples
Analysing 840 locations does not by itself establish quantitative tritium measurements at the required accuracy. The research report identifies future ex-situ LIBS and post-mortem analysis of removed JET tiles as validation steps. Extending measurement coverage and establishing confidence in the values remain different tasks.
In October 2025, UKAEA also described characterisation of 66 tiles and components retrieved in 2024. Those 66 items and the approximately 840 measurement locations are different counts; the sources do not establish a one-to-one correspondence. UKAEA's account explains the retrieval work.
The MRF hot-cell and analysis photographs illustrate UKAEA's wider materials-research infrastructure. They do not document the JET LIBS apparatus or establish that these particular samples were analysed at MRF. Shielded handling of removed material and bringing an instrument into a vessel serve different roles.


Measurements that can inform operating decisions
Fuel accumulation in future fusion-machine walls matters for operations and safety. In-vessel access to more measurement locations could complement sample removal. A demonstration during a JET maintenance period does not establish continuous monitoring in an operating power plant.
UKAEA describes MRF's capabilities as including hot cells, sample preparation and characterisation of irradiated materials. Its building photograph illustrates that separate laboratory infrastructure, rather than the location of the JET experiment. UKAEA materials capabilities
FI's reading of this experiment is that lasers, spectroscopy, remote handling, calibration and sample analysis jointly support a usable measurement. Component specifications alone do not produce decision-ready data. Recording where and under what conditions a measurement was made, and what it was checked against, connects instrument, robotics and analysis suppliers to fusion engineering. This is editorial analysis, rather than a notice of a new contract.

- Likonen et al.:JET炉内LIBS実験(2024年10月実施、2025年5月会議)
- UKAEA:試料回収とレーザーによる炉内分析(2025年10月1日)
- UKAEA:MASCOTと遠隔操作設備(2024年2月26日)
- UKAEA:材料研究施設の分析設備
Information checked as of:2026-11-23
2024年10月に行われた実験を2025年会議報告・同年10月UKAEA説明から読む技術解説。原著では炉外検証は今後の工程。約840地点と66試料は別の集計。商用炉の常時計測実証と扱わない。