01Sponsored article
An advertising article introducing your products, services, or activities using public materials and copy supplied by your organisation, structured to help readers understand them.
Illustrative format and outlineSample Fusion manufactures vacuum piping and connecting components for fusion experiments
Fictional manufacturer Sample Fusion designs, machines, assembles, and inspects vacuum piping, flanges, and instrument mounts.
Illustrative outline- Application and reader needs
- Product features
- Verifiable specifications and track record
- A route to contact the company
These examples show possible article structures. They are not client case studies or live vacancies.
Read the full example → 02Collaborative sponsored feature
A jointly planned advertising feature built around a reader's question. Technical explanations or interviews can explore the context and strengths of your work. Interview arrangements are discussed individually.
Illustrative format and outlineWhat to check before ordering vacuum piping: interface dimensions, leak testing, and replacement
Using fictional manufacturer Sample Fusion as an example, this article explains the interface dimensions, leak tests, and replacement procedures to confirm before ordering vacuum piping.
Illustrative outline- The technical challenge
- Insights from the people doing the work
- Process explanations with photographs and diagrams
- Capabilities and remaining challenges
These examples show possible article structures. They are not client case studies or live vacancies.
Read the full example → 03Recruitment listing
Present the role, the equipment and technology involved, responsibilities, and required experience, then direct interested candidates to your official recruitment information.
Illustrative format and outlineWhat does a vacuum piping mechanical designer do? Drawings, manufacturing coordination, and inspection coordination
This fictional role profile describes specification checks, drawing preparation, manufacturing coordination, and inspection record reviews; it is not a job vacancy.
Illustrative outline- What the team develops and why
- Responsibilities
- Required and preferred experience
- Location, employment terms, and the official vacancy
These examples show possible article structures. They are not client case studies or live vacancies.
Read the full example →