About the data
PROCUREMENT

Fusion procurement and funding opportunities

Explore current work, research and support opportunities in official notices.

Confirmed open 22 entriesNew in the past 7 days 16 entriesDeadlines within 7 days 3 entriesApplication period needs checking 2 entriesAll listed 28 entries

Official information is checked automatically at midnight Japan time each day

Data last updated: 2026/11/15 13:16(日本時間)
Last successful automated collection (within the scheduled scope): No completed run has been recorded yet

Some sources could not be checked successfully. Review the last check time for each source.

Listings are compiled from official notices. Confirm current terms and deadlines with the issuer. Web posting periods and submission deadlines may differ. Unknown submission deadlines are marked for verification; elapsed deadlines are identified as such. Also check earlier document-distribution and technical-review deadlines. New listings were first published on FI within seven days. This is not a comprehensive directory of every issuer and opportunity.

22 entries(1〜12件)

Title / organizationStatus / typeParticipation steps and deadlinesNotice date / last checked
フュージョンエネルギーの経済的・社会的な価値の調査・分析 (Japanese)

国立研究開発法人量子科学技術研究開発機構

経済波及効果・エネルギー安全保障

View scope and participation conditions

核融合の要素技術が産業にもたらす経済波及効果と、導入シナリオに基づくエネルギー安全保障上の価値を調査・分析する参加者確認公募。

核融合要素技術の産業への波及効果・経済性評価、日本の電源構成及び安全保障上の価値を評価できる者。未認定の競争参加資格でも参加意思確認書は提出可能だが、競争的手続へ移る場合は技術提案書提出までに資格認定が必要。全条件は公式公告を確認。

手続の言語・通貨は日本語・日本国通貨。日本企業一般の資格適合は保証しない。

Official notice ↗
受付中

公募・支援

Eligibility needs checking

Steps and dates to check before participating
Application or bid submission
2026-11-16 (time not verified) JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-10-29

2026/11/03 00:15(日本時間)

液相焼結法によるQ-DEMO第三期先進ブランケット用固定用スリーブの開発 (Japanese)

国立研究開発法人量子科学技術研究開発機構

ブランケット・SiC/SiC・液相焼結

View scope and participation conditions

Q-DEMOの先進ブランケットで使う固定用SiC/SiCスリーブについて、液相焼結による開発課題を調査する参加者確認公募。

SiC/SiC複合材料開発の経験・実績を有し、液相焼結による試作が可能な者。競争参加資格が未認定でも意思確認書を提出できるが、競争的契約手続へ進む場合は技術提案書等の提出時までに資格認定が必要。欠格要件を含む全条件は公式公告を確認。

手続の言語・通貨は日本語・日本国通貨。日本企業一般の資格適合は保証しない。

Official notice ↗
受付中

公募・支援

Eligibility needs checking

Steps and dates to check before participating
Application or bid submission
2026-11-16 (time not verified) JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-10-30

2026/11/04 00:07(日本時間)

Engineering Design Study of Protective Limiters for Q-DEMO

National Institutes for Quantum Science and Technology, National Research and Development Agency
Rokkasho Institute for Fusion Energy

Demonstration-reactor design・Thermal analysis・Structural analysis

View scope and participation conditions

Study of protective limiters for Q-DEMO's initial phase,including heat-removal structures and the feasibility of temperature,stress and electromagnetic-load support.

Unified government competitive-bidding qualification, absence of disqualifying conditions such as suspension, and specified declarations are required. Check the notice and tender documents for all requirements, including technical conditions.

Official notice ↗
受付中

Technical services

Eligibility needs checking

Steps and dates to check before participating
Application or bid submission
2026-11-20 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-10-02

2026/10/25 00:07(日本時間)

ITERダイバータ高熱負荷試験用タングステン・ステンレス鋼クラッドタイルの製作 (Japanese)

国立研究開発法人量子科学技術研究開発機構
那珂フュージョン科学技術研究所

ITER・ダイバータ・タングステン・SUS316L・クラッド接合

View scope and participation conditions

ITERダイバータの高熱負荷試験に使うタングステン・ステンレス鋼クラッドタイルの製作について、予定する契約候補者以外に対応可能な企業が存在するかを確認する参加者確認公募。

公募仕様に対応でき、全省庁資格等の条件を満たした事業者が参加意思確認書を提出する。詳細は公募公告で確認。

参加資格の個別適合は未判定。公式公告・説明書の原文で最新条件を確認。

Official notice ↗
受付中

Other

Eligibility needs checking

Steps and dates to check before participating
Application or bid submission
2026-11-26 17:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-11-10

2026/11/15 12:16(日本時間)

化学気相浸透法によるQ-DEMO第三期先進ブランケット用固定用スリーブの開発 (Japanese)

国立研究開発法人量子科学技術研究開発機構

ブランケット・SiC/SiC・化学気相浸透法

View scope and participation conditions

Q-DEMOの先進ブランケットで使う固定用SiC/SiCスリーブについて、化学気相浸透法による開発課題を調査する参加者確認公募。

SiC/SiC複合材料開発の経験・実績を有し、化学気相浸透法による試作が可能な者。競争参加資格が未認定でも意思確認書を提出できるが、競争的契約手続へ進む場合は技術提案書等の提出時までに資格認定が必要。欠格要件を含む全条件は公式公告を確認。

手続の言語・通貨は日本語・日本国通貨。日本企業一般の資格適合は保証しない。

Official notice ↗
受付中

公募・支援

Eligibility needs checking

Steps and dates to check before participating
Application or bid submission
2026-11-26 (time not verified) JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-11-10

2026/11/10 00:10(日本時間)

Purchase of High-Voltage Power Supplies for the IFMIF/EVEDA Prototype Accelerator Injector

National Institutes for Quantum Science and Technology, National Research and Development Agency
Rokkasho Institute for Fusion Energy

Accelerators・High-voltage power supplies

View scope and participation conditions

Purchase of a complete high-voltage power-supply set for the IFMIF/EVEDA prototype accelerator injector. Compatibility with existing equipment and controls is required,and the specification prohibits equivalent substitute products.

Applicants must hold FY2026 unified qualification for government competitive bidding and demonstrate prompt after-sales service and maintenance. Check the notice and tender documents for all conditions, including disqualification and transaction suspensions.

Procedures use Japanese and Japanese currency. Individual company eligibility has not been assessed.

Official notice ↗
受付中

物品・製造

Eligibility needs checking

Steps and dates to check before participating
Application or bid submission
2026-11-27 17:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-10-07

2026/10/25 00:07(日本時間)

原型炉プラントにおける国際標準化案の骨子策定及び具現化に向けた調査・検討 (Japanese)

国立研究開発法人量子科学技術研究開発機構
六ヶ所フュージョンエネルギー研究所

原型炉設計・標準化

View scope and participation conditions

原型炉プラントの国際標準化に向け、標準化案の構成と具体化の進め方を調査・検討する委託案件。

全省庁統一競争入札参加資格、指名停止等の欠格事項に該当しないこと、指定誓約書など。技術条件を含む全要件は公告・入札説明書を確認。

Official notice ↗
受付中

Technical services

Eligibility needs checking

Steps and dates to check before participating

A preparatory deadline has passed. New participation requires verification.

Obtain tender documents
2026-11-04 17:00 JST (UTC+09:00) Deadline elapsed
Participation and technical documents
2026-11-05 12:00 JST (UTC+09:00) Deadline elapsed
Application or bid submission
2026-11-30 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-10-09

2026/11/03 00:16(日本時間)

IFMIF/EVEDA原型加速器冷凍設備運用に関する技術検討 (Japanese)

国立研究開発法人量子科学技術研究開発機構
六ヶ所フュージョンエネルギー研究所

IFMIF/EVEDA・極低温・安全管理

View scope and participation conditions

IFMIF/EVEDA原型加速器の超伝導線形加速器試験に使うヘリウム冷凍設備について、安全管理、冷凍保安規則への対応、冷却・ビーム運転上の技術課題を検討する業務。

全省庁統一競争入札参加資格を有し、契約規程の欠格条件に該当せず、指名停止中でない者。指定誓約書等を含む全条件は入札公告・入札説明書を確認。

個別の参加資格適合は未判定。全条件は公式公告・説明書を確認。

Official notice ↗
受付中

Technical services

Eligibility needs checking

Steps and dates to check before participating

A preparatory deadline has passed. New participation requires verification.

Obtain tender documents
2026-11-10 17:00 JST (UTC+09:00) Deadline elapsed
Participation and technical documents
2026-11-11 12:00 JST (UTC+09:00) Deadline elapsed
Application or bid submission
2026-12-04 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-10-20

2026/11/10 00:14(日本時間)

燃料システム安全試験施設におけるグローブボックスの耐震評価及び構造設計検討業務 (Japanese)

国立研究開発法人量子科学技術研究開発機構
六ヶ所フュージョンエネルギー研究所

燃料サイクル・耐震評価・構造設計

View scope and participation conditions

六ヶ所で整備する原型炉向け燃料試験施設のグローブボックスを対象に、地震時の健全性を評価し、支持構造などの設計を検討する業務。

全省庁統一競争入札参加資格を有し、契約規程の欠格条件に該当せず、指名停止中でない者。指定誓約書等を含む全条件は入札公告・入札説明書を確認。

個別企業の適格性は未判定。

Official notice ↗
受付中

Technical services

Eligibility needs checking

Steps and dates to check before participating
Obtain tender documents
2026-11-24 17:00 JST (UTC+09:00) Check the deadline
Participation and technical documents
2026-11-25 12:00 JST (UTC+09:00) Check the deadline
Application or bid submission
2026-12-14 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-11-02

2026/11/02 00:10(日本時間)

トカマク規格・マグネット材料規定の原案検討作業 (Japanese)

国立研究開発法人量子科学技術研究開発機構
六ヶ所フュージョンエネルギー研究所

国際標準化・トカマク・マグネット

View scope and participation conditions

フュージョンエネルギー分野の国際標準化に向け、トカマク規格とマグネット材料規定の原案を調査・検討する業務。

全省庁統一競争入札参加資格を有し、契約規程の欠格条件に該当せず、指名停止中でない者。指定誓約書等を含む全条件は入札公告・入札説明書を確認。

個別の参加資格適合は未判定。全条件は公式公告・説明書を確認。

Official notice ↗
受付中

Technical services

Eligibility needs checking

Steps and dates to check before participating
Obtain tender documents
2026-11-18 17:00 JST (UTC+09:00) Check the deadline
Participation and technical documents
2026-11-19 12:00 JST (UTC+09:00) Check the deadline
Application or bid submission
2026-12-16 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-10-28

2026/11/11 00:00(日本時間)

燃料システム安全試験施設におけるWater Detritiation System(WDS)閉じ込め系の概念設計業務 (Japanese)

国立研究開発法人量子科学技術研究開発機構
六ヶ所フュージョンエネルギー研究所

燃料サイクル・トリチウム閉じ込め・概念設計

View scope and participation conditions

核融合原型炉向け燃料試験施設の水トリチウム除去設備を対象に、漏えいや拡散を防ぐ閉じ込め系の構成と設計条件を検討する業務。

全省庁統一競争入札参加資格を有し、契約規程の欠格条件に該当せず、指名停止中でない者。指定誓約書等を含む全条件は入札公告・入札説明書を確認。

個別の参加資格適合は未判定。全条件は公式公告・説明書を確認。

Official notice ↗
受付中

Technical services

Eligibility needs checking

Steps and dates to check before participating
Obtain tender documents
2026-11-25 17:00 JST (UTC+09:00) Check the deadline
Participation and technical documents
2026-11-26 12:00 JST (UTC+09:00) Check the deadline
Application or bid submission
2026-12-16 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-11-04

2026/11/04 00:03(日本時間)

燃料システム安全試験施設における極低温ヘリウム設備の基本設計検討業務 (Japanese)

国立研究開発法人量子科学技術研究開発機構
六ヶ所フュージョンエネルギー研究所

燃料システム・極低温・原型炉

View scope and participation conditions

核融合原型炉の燃料システム安全試験施設で使う水素同位体分離系やペレット入射系に向け、極低温ヘリウム設備の冷媒需要と基本設計を検討する業務。

全省庁統一競争入札参加資格を有し、契約規程の欠格条件に該当せず、指名停止中でない者。指定誓約書等を含む全条件は入札公告・入札説明書を確認。

個別の参加資格適合は未判定。全条件は公式公告・説明書を確認。

Official notice ↗
受付中

Technical services

Eligibility needs checking

Steps and dates to check before participating
Obtain tender documents
2026-11-26 17:00 JST (UTC+09:00) Check the deadline
Participation and technical documents
2026-11-27 12:00 JST (UTC+09:00) Check the deadline
Application or bid submission
2026-12-18 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

2026-11-05

2026/11/11 00:05(日本時間)

受付中

フュージョンエネルギーの経済的・社会的な価値の調査・分析 (Japanese)

国立研究開発法人量子科学技術研究開発機構

核融合の要素技術が産業にもたらす経済波及効果と、導入シナリオに基づくエネルギー安全保障上の価値を調査・分析する参加者確認公募。

Type
公募・支援
Technology field
経済波及効果・エネルギー安全保障
Application / submission deadline
2026-11-16(日本時間)・時刻未確認
Participation conditions
核融合要素技術の産業への波及効果・経済性評価、日本の電源構成及び安全保障上の価値を評価できる者。未認定の競争参加資格でも参加意思確認書は提出可能だが、競争的手続へ移る場合は技術提案書提出までに資格認定が必要。全条件は公式公告を確認。
Notice date
2026-10-29
Last checked
2026/11/03 00:15(日本時間)
Steps and dates to check before participating
Application or bid submission
2026-11-16 (time not verified) JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
受付中

液相焼結法によるQ-DEMO第三期先進ブランケット用固定用スリーブの開発 (Japanese)

国立研究開発法人量子科学技術研究開発機構

Q-DEMOの先進ブランケットで使う固定用SiC/SiCスリーブについて、液相焼結による開発課題を調査する参加者確認公募。

Type
公募・支援
Technology field
ブランケット・SiC/SiC・液相焼結
Application / submission deadline
2026-11-16(日本時間)・時刻未確認
Participation conditions
SiC/SiC複合材料開発の経験・実績を有し、液相焼結による試作が可能な者。競争参加資格が未認定でも意思確認書を提出できるが、競争的契約手続へ進む場合は技術提案書等の提出時までに資格認定が必要。欠格要件を含む全条件は公式公告を確認。
Notice date
2026-10-30
Last checked
2026/11/04 00:07(日本時間)
Steps and dates to check before participating
Application or bid submission
2026-11-16 (time not verified) JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
受付中

Engineering Design Study of Protective Limiters for Q-DEMO

National Institutes for Quantum Science and Technology, National Research and Development Agency

Study of protective limiters for Q-DEMO's initial phase,including heat-removal structures and the feasibility of temperature,stress and electromagnetic-load support.

Type
Technical services
Technology field
Demonstration-reactor design・Thermal analysis・Structural analysis
Application / submission deadline
2026-11-20 12:00(日本時間)
Participation conditions
Unified government competitive-bidding qualification, absence of disqualifying conditions such as suspension, and specified declarations are required. Check the notice and tender documents for all requirements, including technical conditions.
Notice date
2026-10-02
Last checked
2026/10/25 00:07(日本時間)
Steps and dates to check before participating
Application or bid submission
2026-11-20 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
受付中

ITERダイバータ高熱負荷試験用タングステン・ステンレス鋼クラッドタイルの製作 (Japanese)

国立研究開発法人量子科学技術研究開発機構

ITERダイバータの高熱負荷試験に使うタングステン・ステンレス鋼クラッドタイルの製作について、予定する契約候補者以外に対応可能な企業が存在するかを確認する参加者確認公募。

Type
Other
Technology field
ITER・ダイバータ・タングステン・SUS316L・クラッド接合
Application / submission deadline
2026-11-26 17:00(日本時間)
Participation conditions
公募仕様に対応でき、全省庁資格等の条件を満たした事業者が参加意思確認書を提出する。詳細は公募公告で確認。
Notice date
2026-11-10
Last checked
2026/11/15 12:16(日本時間)
Steps and dates to check before participating
Application or bid submission
2026-11-26 17:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
受付中

化学気相浸透法によるQ-DEMO第三期先進ブランケット用固定用スリーブの開発 (Japanese)

国立研究開発法人量子科学技術研究開発機構

Q-DEMOの先進ブランケットで使う固定用SiC/SiCスリーブについて、化学気相浸透法による開発課題を調査する参加者確認公募。

Type
公募・支援
Technology field
ブランケット・SiC/SiC・化学気相浸透法
Application / submission deadline
2026-11-26(日本時間)・時刻未確認
Participation conditions
SiC/SiC複合材料開発の経験・実績を有し、化学気相浸透法による試作が可能な者。競争参加資格が未認定でも意思確認書を提出できるが、競争的契約手続へ進む場合は技術提案書等の提出時までに資格認定が必要。欠格要件を含む全条件は公式公告を確認。
Notice date
2026-11-10
Last checked
2026/11/10 00:10(日本時間)
Steps and dates to check before participating
Application or bid submission
2026-11-26 (time not verified) JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
受付中

Purchase of High-Voltage Power Supplies for the IFMIF/EVEDA Prototype Accelerator Injector

National Institutes for Quantum Science and Technology, National Research and Development Agency

Purchase of a complete high-voltage power-supply set for the IFMIF/EVEDA prototype accelerator injector. Compatibility with existing equipment and controls is required,and the specification prohibits equivalent substitute products.

Type
物品・製造
Technology field
Accelerators・High-voltage power supplies
Application / submission deadline
2026-11-27 17:00(日本時間)
Participation conditions
Applicants must hold FY2026 unified qualification for government competitive bidding and demonstrate prompt after-sales service and maintenance. Check the notice and tender documents for all conditions, including disqualification and transaction suspensions.
Notice date
2026-10-07
Last checked
2026/10/25 00:07(日本時間)
Steps and dates to check before participating
Application or bid submission
2026-11-27 17:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
受付中

原型炉プラントにおける国際標準化案の骨子策定及び具現化に向けた調査・検討 (Japanese)

国立研究開発法人量子科学技術研究開発機構

原型炉プラントの国際標準化に向け、標準化案の構成と具体化の進め方を調査・検討する委託案件。

Type
Technical services
Technology field
原型炉設計・標準化
Application / submission deadline
2026-11-30 12:00(日本時間)
Participation conditions
全省庁統一競争入札参加資格、指名停止等の欠格事項に該当しないこと、指定誓約書など。技術条件を含む全要件は公告・入札説明書を確認。
Notice date
2026-10-09
Last checked
2026/11/03 00:16(日本時間)
Steps and dates to check before participating

A preparatory deadline has passed. New participation requires verification.

Obtain tender documents
2026-11-04 17:00 JST (UTC+09:00) Deadline elapsed
Participation and technical documents
2026-11-05 12:00 JST (UTC+09:00) Deadline elapsed
Application or bid submission
2026-11-30 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
受付中

IFMIF/EVEDA原型加速器冷凍設備運用に関する技術検討 (Japanese)

国立研究開発法人量子科学技術研究開発機構

IFMIF/EVEDA原型加速器の超伝導線形加速器試験に使うヘリウム冷凍設備について、安全管理、冷凍保安規則への対応、冷却・ビーム運転上の技術課題を検討する業務。

Type
Technical services
Technology field
IFMIF/EVEDA・極低温・安全管理
Application / submission deadline
2026-12-04 12:00(日本時間)
Participation conditions
全省庁統一競争入札参加資格を有し、契約規程の欠格条件に該当せず、指名停止中でない者。指定誓約書等を含む全条件は入札公告・入札説明書を確認。
Notice date
2026-10-20
Last checked
2026/11/10 00:14(日本時間)
Steps and dates to check before participating

A preparatory deadline has passed. New participation requires verification.

Obtain tender documents
2026-11-10 17:00 JST (UTC+09:00) Deadline elapsed
Participation and technical documents
2026-11-11 12:00 JST (UTC+09:00) Deadline elapsed
Application or bid submission
2026-12-04 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
受付中

燃料システム安全試験施設におけるグローブボックスの耐震評価及び構造設計検討業務 (Japanese)

国立研究開発法人量子科学技術研究開発機構

六ヶ所で整備する原型炉向け燃料試験施設のグローブボックスを対象に、地震時の健全性を評価し、支持構造などの設計を検討する業務。

Type
Technical services
Technology field
燃料サイクル・耐震評価・構造設計
Application / submission deadline
2026-12-14 12:00(日本時間)
Participation conditions
全省庁統一競争入札参加資格を有し、契約規程の欠格条件に該当せず、指名停止中でない者。指定誓約書等を含む全条件は入札公告・入札説明書を確認。
Notice date
2026-11-02
Last checked
2026/11/02 00:10(日本時間)
Steps and dates to check before participating
Obtain tender documents
2026-11-24 17:00 JST (UTC+09:00) Check the deadline
Participation and technical documents
2026-11-25 12:00 JST (UTC+09:00) Check the deadline
Application or bid submission
2026-12-14 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
受付中

トカマク規格・マグネット材料規定の原案検討作業 (Japanese)

国立研究開発法人量子科学技術研究開発機構

フュージョンエネルギー分野の国際標準化に向け、トカマク規格とマグネット材料規定の原案を調査・検討する業務。

Type
Technical services
Technology field
国際標準化・トカマク・マグネット
Application / submission deadline
2026-12-16 12:00(日本時間)
Participation conditions
全省庁統一競争入札参加資格を有し、契約規程の欠格条件に該当せず、指名停止中でない者。指定誓約書等を含む全条件は入札公告・入札説明書を確認。
Notice date
2026-10-28
Last checked
2026/11/11 00:00(日本時間)
Steps and dates to check before participating
Obtain tender documents
2026-11-18 17:00 JST (UTC+09:00) Check the deadline
Participation and technical documents
2026-11-19 12:00 JST (UTC+09:00) Check the deadline
Application or bid submission
2026-12-16 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
受付中

燃料システム安全試験施設におけるWater Detritiation System(WDS)閉じ込め系の概念設計業務 (Japanese)

国立研究開発法人量子科学技術研究開発機構

核融合原型炉向け燃料試験施設の水トリチウム除去設備を対象に、漏えいや拡散を防ぐ閉じ込め系の構成と設計条件を検討する業務。

Type
Technical services
Technology field
燃料サイクル・トリチウム閉じ込め・概念設計
Application / submission deadline
2026-12-16 12:00(日本時間)
Participation conditions
全省庁統一競争入札参加資格を有し、契約規程の欠格条件に該当せず、指名停止中でない者。指定誓約書等を含む全条件は入札公告・入札説明書を確認。
Notice date
2026-11-04
Last checked
2026/11/04 00:03(日本時間)
Steps and dates to check before participating
Obtain tender documents
2026-11-25 17:00 JST (UTC+09:00) Check the deadline
Participation and technical documents
2026-11-26 12:00 JST (UTC+09:00) Check the deadline
Application or bid submission
2026-12-16 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
受付中

燃料システム安全試験施設における極低温ヘリウム設備の基本設計検討業務 (Japanese)

国立研究開発法人量子科学技術研究開発機構

核融合原型炉の燃料システム安全試験施設で使う水素同位体分離系やペレット入射系に向け、極低温ヘリウム設備の冷媒需要と基本設計を検討する業務。

Type
Technical services
Technology field
燃料システム・極低温・原型炉
Application / submission deadline
2026-12-18 12:00(日本時間)
Participation conditions
全省庁統一競争入札参加資格を有し、契約規程の欠格条件に該当せず、指名停止中でない者。指定誓約書等を含む全条件は入札公告・入札説明書を確認。
Notice date
2026-11-05
Last checked
2026/11/11 00:05(日本時間)
Steps and dates to check before participating
Obtain tender documents
2026-11-26 17:00 JST (UTC+09:00) Check the deadline
Participation and technical documents
2026-11-27 12:00 JST (UTC+09:00) Check the deadline
Application or bid submission
2026-12-18 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Official notice ↗
Last checks and coverage by source

For sources that are difficult to check automatically, we provide official links. Unchecked or failed retrievals are not treated as zero opportunities.

資源エネルギー庁 ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: Not verified

確認範囲は検証中です。公式ページで最新情報をご確認ください。

No successful automated check has been recorded yet. Check the official page for current information.

Fusion for Energy ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: Not verified
Initial research check: 2026/10/12 20:26(日本時間)

確認範囲は検証中です。公式ページで最新情報をご確認ください。

No successful automated check has been recorded yet. Check the official page for current information.

茨城県 ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: Not verified

確認範囲は検証中です。公式ページで最新情報をご確認ください。

No successful automated check has been recorded yet. Check the official page for current information.

ITER Organization ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: Not verified
Initial research check: 2026/10/12 20:26(日本時間)

利用条件・資料へのアクセス制限を踏まえ、自動掲載せず公式ページへの案内にとどめます。

No successful automated check has been recorded yet. Check the official page for current information.

九州大学応用力学研究所 共同利用 ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: Not verified
Initial research check: 2026/10/12 20:40(日本時間)

確認範囲は検証中です。公式ページで最新情報をご確認ください。

No successful automated check has been recorded yet. Check the official page for current information.

経済産業省 ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: Not verified

確認範囲は検証中です。公式ページで最新情報をご確認ください。

No successful automated check has been recorded yet. Check the official page for current information.

NEDO 公募 ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: Not verified
Initial research check: 2026/10/12 20:40(日本時間)

確認範囲は検証中です。公式ページで最新情報をご確認ください。

No successful automated check has been recorded yet. Check the official page for current information.

核融合科学研究所 ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: 2026/10/12 21:38(日本時間)
Initial research check: 2026/10/12 20:34(日本時間)

公開調達一覧の区分別情報を対象とします。用途の根拠が不明な案件は確認済み件数に含めません。

Retrieval or verification issues may mean the last check is outdated.

NIFS 共同研究公募 ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: Not verified
Initial research check: 2026/10/12 20:40(日本時間)

確認範囲は検証中です。公式ページで最新情報をご確認ください。

No successful automated check has been recorded yet. Check the official page for current information.

NIFS 人材育成公募 ↗

Scheduled checks
Last successful automated check: 2026/11/15 00:07(日本時間)
Last retrieval attempt: 2026/11/15 05:31(日本時間)
Initial research check: 2026/10/12 20:40(日本時間)

当該人材育成公募の公式案内と公募要領を確認対象とします。

大阪大学レーザー科学研究所 共同利用・共同研究 ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: Not verified
Initial research check: 2026/10/12 20:34(日本時間)

確認範囲は検証中です。公式ページで最新情報をご確認ください。

No successful automated check has been recorded yet. Check the official page for current information.

大阪大学 ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: Not verified
Initial research check: 2026/10/12 20:26(日本時間)

確認範囲は検証中です。公式ページで最新情報をご確認ください。

No successful automated check has been recorded yet. Check the official page for current information.

QST 本部・千葉・高崎・関西・仙台地区 ↗

Scheduled checks
Last successful automated check: Not verified
Last retrieval attempt: 2026/11/15 05:31(日本時間)
Initial research check: 2026/10/12 20:26(日本時間)

地区別一覧・RSSと掲載済み案件の公告・資料を照合対象とします。全案件の網羅性は未確認です。

Retrieval or verification issues may mean the last check is outdated.

QST 那珂研 ↗

Scheduled checks
Last successful automated check: Not verified
Last retrieval attempt: 2026/11/15 13:16(日本時間)
Initial research check: 2026/10/12 20:26(日本時間)

地区別一覧・RSSと掲載済み案件の公告・資料を照合対象とします。全案件の網羅性は未確認です。

Retrieval or verification issues may mean the last check is outdated.

QST 六ヶ所研 ↗

Scheduled checks
Last successful automated check: Not verified
Last retrieval attempt: 2026/11/15 02:05(日本時間)
Initial research check: 2026/10/12 20:26(日本時間)

地区別一覧・RSSと掲載済み案件の公告・資料を照合対象とします。全案件の網羅性は未確認です。

Retrieval or verification issues may mean the last check is outdated.

UKAEA ↗

Official link / checks being prepared
Last successful automated check: Not verified
Last retrieval attempt: Not verified
Initial research check: 2026/10/12 20:26(日本時間)

確認範囲は検証中です。公式ページで最新情報をご確認ください。

No successful automated check has been recorded yet. Check the official page for current information.