Where could your technology contribute?
Find equipment, materials and services by function, then explore related technologies and companies.
Heating, power supplies, vacuum, measurement and control
Superconductors, magnets, materials and blankets
Fuel cycles, heat exchange, construction and maintenance
| 名称 / 役割 | Country / region | Approach | 確認状況 |
|---|---|---|---|
| Helical Fusion Reactor development From HTS coil manufacturing through HARUKA integrated demonstration to the KANATA electricity concept. Distinguishing verified stages from future objectives in the helical approach. | Japan | Stellarator | 2026-10-08 |
| Helion Energy (Japanese) 炉開発 FRCをパルス圧縮し、電磁誘導で電力を直接回収する炉開発企業。PolarisのD–T実験とOrionの整備を進めるが、正味発電とD–He3燃料の商用化は引き続き検証課題。 | United States | FRC | 2026-10-08 |
| Q and net electricity Understanding the basics Plasma energy gain Q and net electricity after subtracting the entire plant's power consumption are different metrics. Check the measurement boundary before comparing numbers. | — | Enabling technology | 2026-10-08 |
| TAE Technologies (Japanese) 炉開発 中性粒子ビームでFRCの形成・加熱・維持を狙う炉開発企業。Normの成果を受けDa Vinciへ進む。水素・ホウ素を追求しつつ、2026年には将来のヘリウム3供給の選択肢も発表した。 | United States | FRC | 2026-10-08 |
| What Is a Stellarator? Principles, Helical Configurations and Tokamak Differences Confinement methods How do external coils confine a hot plasma? Explore stellarator magnetic fields, the differences between LHD and W7-X, long-pulse results and the engineering challenges on the path to fusion power. | — | Stellarator | 2026-11-03 |
| Tokamak Confinement approaches A tokamak uses magnetic fields to confine hot plasma in a toroidal vessel. Integrated design covering heating, control and materials is essential. | — | Tokamak | 2026-10-08 |
| Blankets and heat recovery Enabling technologies In a D–T fusion reactor, the blanket receives neutron energy as heat and also supports tritium breeding. Heat extraction and material durability are crucial. | — | Enabling technology | 2026-10-08 |
| Laser fusion Confinement approaches Lasers compress and heat tiny fuel targets. For power generation, integrating high-repetition-rate irradiation with target supply is a challenge. | — | Laser / ICF | 2026-10-08 |
| Kyoto Fusioneering Equipment and systems From heating-equipment deliveries to integrated fuel-cycle and heat-recovery testing: what UNITY sites test and how the company connects reactor developers with manufacturers. | Japan | Enabling technologies | 2026-10-08 |
| Fuel cycle Enabling technologies Fusion fuel does not simply pass through a reactor once. Understand the separate tasks of recovering unburned fuel from a D–T system’s exhaust, replacing consumed tritium, and preparing fuel for reuse. | — | Enabling technology | 2026-10-08 |
| High-temperature superconducting magnets Enabling technologies Magnet technology for producing strong magnetic fields. CFS uses REBCO high-temperature superconducting materials in more compact high-field tokamaks. | — | Enabling technology | 2026-10-08 |