About the data

Engineering Design Study of Protective Limiters for Q-DEMO

Study of protective limiters for Q-DEMO's initial phase,including heat-removal structures and the feasibility of temperature,stress and electromagnetic-load support.

Published Updated
Share this article
Read the Japanese original

公募・調達の概要

Steps and dates to check before participating
Application or bid submission
2026-11-20 12:00 JST (UTC+09:00) Check the deadline

These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.

Sales and engineering review

This is a review workflow, not a determination of tender requirements or eligibility.

  1. Can you supply the required product or technology?

    Check the model, materials, performance, acceptance of equivalents and delivery scope. Trading firms should verify their manufacturers and supply arrangements; manufacturers should review standard-product fit versus custom engineering.

  2. Can you meet the participation conditions?

    Compare the notice’s qualification, experience, technical review, maintenance and declaration requirements against your company’s evidence.

  3. Plan internal approval and submission

    Assign owners and dates for obtaining documents, questions, technical submissions, costing, approval and bidding. Review delivery, inspection and warranty conditions before quoting.

受付中

募集状況は最終確認時点の公式情報に基づきます。最新の募集条件・締切日時は必ず公式資料をご確認ください。応募手続きは発注機関の公式サイトで行ってください。

発注・募集機関
National Institutes for Quantum Science and Technology, National Research and Development Agency
対象施設・計画
Rokkasho Institute for Fusion Energy
公告番号・ロット
R08RE-12138
Type
Technical services
技術・業種
Demonstration-reactor design・Thermal analysis・Structural analysis・R&D and technical services
Notice date
2026-10-02
Web公告掲載開始
2026-10-02(日本時間)・時刻未確認
Web公告掲載終了
2026-10-23(日本時間)・時刻未確認

応募・入札の提出締切とは別の項目です。

応募・入札書の提出締切
2026-11-20 12:00(日本時間)
情報の最終確認
2026/10/25 00:07(日本時間)

資料交付・技術資料・開札などの日程

Deadline to request tender documents
2026-10-23 17:00(日本時間)
Deadline for bidding and technical-review documents
2026-10-26 12:00(日本時間)
Delivery / performance deadline
2027-02-26(日本時間)・時刻未確認

開札日・説明会・資料請求期限は、応募書類の提出締切として扱っていません。

参加資格

応募資格は要確認

Unified government competitive-bidding qualification, absence of disqualifying conditions such as suspension, and specified declarations are required. Check the notice and tender documents for all requirements, including technical conditions.

Prepare an internal review note

Copies recorded opportunity information and official links. Add owners, product fit, costs and your participation decision internally. No external submission is made.

公式の募集状況

Checked QST's current district list and individual notice. No cancellation notice was displayed. Status was not inferred solely from deadlines.

状態の確認:2026/10/21 00:05(日本時間)

公式公告・応募案内へ ↗

仕様書・公募要領・関連資料

情報源

終了・取消情報も履歴として保存します。公式ページから見つからなくなったことだけを理由に、取消・終了とは判定しません。

Key points and sources from official procurement notices and calls are summarized in the opportunity information above. Verify the latest conditions in official documents before applying or bidding.

Share this article