Naka: Superconducting Coil Research Position (2027 Graduates)
Evaluation and analysis of ITER/JT-60SA superconducting coils, and design of high-temperature superconducting coils.
Read the Japanese originalApplication deadline: Rolling selection is mentioned, but the examination schedule still shows May–June 2026; current acceptance must be checked.(Official time and timezone not confirmed)
Checked: 2026-10-08. Check the official call before applying, including any changes or early closure.
Responsibilities
Evaluation and analysis of ITER/JT-60SA superconducting coils, and design of high-temperature superconducting coils.
Official vacancy: Requisition 26002: Research and development of superconducting coils for fusion reactors towards fusion energy
Official job category: Research
Eligibility
- Education/degree: Expected completion of a science/engineering master's or doctoral programme by March 2027, or completion in March 2024 or later.
- Experience: Research/development experience in at least one of superconducting wires/coils, cryogenic refrigerators/structural materials, or electrical insulation materials.
- Language: No language requirement is explicitly stated. This does not guarantee that language skills are unnecessary.
Employment and contract
Expected start April 1, 2027. Six-month probation.
Application route and selection
Apply through the official recruitment system following the vacancy instructions.
Document screening, online aptitude test, written examination and two interviews. Confirm the actual schedule.
Deadline and verification notes
Rolling selection is mentioned, but the examination schedule still shows May–June 2026; current acceptance must be checked.
- Treat separately from currently open vacancies, as an example of requirements for research roles.
- The inclusion of master's graduates applies to this particular vacancy.
This records public information checked on October 8, 2026. Vacancy conditions and acceptance may change or close. Before applying, check the official vacancy for current conditions.
求人 DATA
- Hiring organization
- QST
- Location
- Naka,Ibaraki / Naka site
- Employment type
- Retirement-age staff appointment (research)
- Call reference
- 26002
- Application deadline
- Rolling selection is mentioned, but the examination schedule still shows May–June 2026; current acceptance must be checked.
- Time zone
- Official time and timezone not confirmed
- Key requirements
- Expected completion of a science/engineering master's or doctoral programme by March 2027, or completion in March 2024 or later. Research/development experience in at least one of superconducting wires/coils, cryogenic refrigerators/structural materials, or electrical insulation materials.
Check the official information
Checked:2026-10-08