LINEA Innovations Inc.
A Japanese fusion company combining hydrogen–boron fuel with FRC and mirror fields. Distinguish completed ion-source fabrication from planned beam tests, reaction demonstrations and power generation.
Official company website ↗Read the Japanese originalCompany profile
- Official name
- LINEA Innovations Inc.
- English name
- LINEA Innovations, inc.
- Location
- Tokyo
- Established
- 2023
- Industry
- Fusion startup
- Technology field
- FRC・Magnetic mirror・Advanced fuels
- Type of involvement
- Association membership・Research and development
Role in the fusion industry
Researches and develops a proprietary reactor combining an FRC with a mirror magnetic field and using the p–11B reaction. A commercial reactor remains a development objective.
Key products and technologies
- High-energy beams
- FRC and mirror magnetic field
Disclosed involvement and track record
Listed under the name LINEA Innovations Inc. as a special member in the J-Fusion membership directory as of September 17, 2026.
Association membership does not establish a record of supplying or delivering equipment to a specific device.
J-Fusion membership directory ↗Researches and develops a proprietary reactor combining an FRC with a mirror magnetic field and using the p–11B reaction. A commercial reactor remains a development objective.
LINEA Innovations Inc. Official fusion-related information ↗Related projects
A relationship with a specific project has not been verified.
- J-Fusion membership directory(Verified 2026-10-12)
- LINEA Innovations Inc. Official company information(Verified 2026-10-12)
- LINEA Innovations Inc. Official fusion-related information(Verified 2026-10-12)
Last verified: 2026/10/12 20:18:37 (Japan time)
Business overview
Develops fusion reactors and related technologies using hydrogen-boron reactions.
Relationship with the fusion industry
Researches and develops a proprietary reactor combining an FRC with a mirror magnetic field and using the p–11B reaction. A commercial reactor remains a development objective.
Verified involvement
Listed under the name LINEA Innovations Inc. as a special member in the J-Fusion membership directory as of September 17, 2026.
Researches and develops a proprietary reactor combining an FRC with a mirror magnetic field and using the p–11B reaction. A commercial reactor remains a development objective.
How to interpret this information
Membership, research and development, orders, deliveries, investment and lending are different forms of involvement. Future power-generation or commercialization targets are not achieved results. Items not listed have not been verified.
Sources
- J-Fusion membership directory
- LINEA Innovations Inc. Official company information
- LINEA Innovations Inc. Official fusion-related information
Why combine beams, an FRC and a mirror field?
LINEA Innovations is a Japanese fusion company established on 29 September 2023. It develops a commercial-reactor concept and related technology based on hydrogen–boron-11 (p–11B) fusion. Comparing fusion businesses requires looking beyond the label FRC to the fuel and the way energy is supplied to particles.
The company proposes a non-thermal approach, injecting an energetic hydrogen beam into a dense boron-containing plasma. Unlike bringing the whole plasma toward thermal self-ignition, this requires particles with different energies to coexist in the same region. Its design combines the high-beta properties of an FRC—high plasma pressure relative to magnetic pressure—with mirror-field confinement of energetic particles.
A completed ion source is not yet a fusion-reaction demonstration
According to the technical report published on 5 October 2026, fabrication of its neutral-beam-injection (NBI) ion source was completed in August, followed by preparations for beam-extraction testing. Presentations at two academic meetings in August discussed design choices and numerical analyses performed before fabrication. The report's publication date differs from the month of fabrication and the conference presentations.
Next steps described in that report include beam measurements and p–11B reaction tests, with detection of produced alpha particles as an initial evaluation. The report does not say alpha detection had already been achieved, or that electricity output exceeded input. Component fabrication, beam formation, reaction-product detection, fusion output and electrical energy accounting are distinct stages.
What matters for commercialization?
Choosing hydrogen and boron changes the questions around fuel supply and tritium management compared with DT. But company goals such as neutron-free operation should not be extended into a guarantee that radiation management or materials assessment would be unnecessary under every operating condition. Evaluation must follow the actual reactions, equipment conditions and measurements.
Relevant industrial capabilities include ion sources and beam transport, vacuum systems, high voltage, magnetic design, particle diagnostics and control. The company is easier to understand when its eventual reactor concept is considered alongside the equipment currently being manufactured and tested. These technical fields are not a claim that particular vacancies or procurement opportunities are open.
Technical background sources
- https://linea-innovations.com/about/profile/
- https://linea-innovations.com/technology/
- https://linea-innovations.com/news/tech-report/549/
Related research institutes and how to read the technology
Research infrastructure for heating, particle beams and diagnostics is discussed in the NIFS profile; the roles of large facilities and reactor engineering are explained in the QST profile. These are contextual reading links, not evidence of contracts or partnerships with LINEA.
Companies DATA
- Country
- Japan
Check the official information
Checked:Not recorded