Security Coordinator | IO1190
Coordinate physical-security equipment such as surveillance and access control, and related contracts and operations.
Read the Japanese originalApplication deadline: November 11, 2026 at 23:50, France local time, CET/UTC+1.(Europe/Paris(CET・UTC+1))
Checked: 2026-10-08. Check the official call before applying, including any changes or early closure.
Responsibilities
Coordinate physical-security equipment such as surveillance and access control, and related contracts and operations.
Official vacancy: Security Coordinator IO1190
Official job category: Security systems and technical support
Eligibility
- Education/degree: Master's degree in engineering or equivalent. An alternative based on extensive relevant professional experience and certified training is provided.
- Experience: Experience managing and maintaining CCTV, access control, intrusion detection, servers and facilities, risk assessment, and project/contract management. No uniform minimum number of years was confirmed.
- Language: Fluent written and spoken English.
- Eligible applicants: Regular staff applicants must hold nationality of an ITER Member, including Japan.
- Other requirements: French security clearance is required for appointment. Shift and on-call work applies. A driving licence valid in France is required where applicable.
Employment and contract
Initial contract up to five years, with possible extension.
Application route and selection
Apply online through the individual vacancy in ITER's official recruitment system.
Official staff selection. Check the vacancy and application form for documents and procedures.
Deadline and verification notes
November 11, 2026 at 23:50, France local time, CET/UTC+1.
- An example showing that a G5 support position still requires specialist qualifications and experience; do not present it as general administration for inexperienced applicants.
This records public information checked on October 8, 2026. Vacancy conditions and acceptance may change or close. Before applying, check the official vacancy for current conditions.
求人 DATA
- Hiring organization
- ITER
- Location
- Saint-Paul-lez-Durance,France / ITER Organization
- Employment type
- ITER staff, G5; initial contract up to five years, possible extension
- Call reference
- IO1190
- Application deadline
- November 11, 2026 at 23:50, France local time, CET/UTC+1.
- Time zone
- Europe/Paris(CET・UTC+1)
- Key requirements
- Master's degree in engineering or equivalent. An alternative based on extensive relevant professional experience and certified training is provided. Experience managing and maintaining CCTV, access control, intrusion detection, servers and facilities, risk assessment, and project/contract management. No uniform minimum number of years was confirmed.
Check the official information
- ITER recruitment FAQs
- ITER open positions
- Japanese domestic agency: staff applications
- Security Coordinator IO1190
Checked:2026-10-08