Manufacture of a Maintenance-Tool Prototype for ITER Shield-Block Temporary Plugs
The October1,2026 notice was cancelled on October6. A new notice with the same procurement number and title was posted on another page on October20; consult the new notice's conditions.
Read the Japanese original公募・調達の概要
This record is closed, cancelled or suspended. Check the official page for a new notice.
These are recorded dates. Check the official notice for changes, extensions and whether you can still participate.
Sales and engineering review
This is a review workflow, not a determination of tender requirements or eligibility.
- Can you supply the required product or technology?
Check the model, materials, performance, acceptance of equivalents and delivery scope. Trading firms should verify their manufacturers and supply arrangements; manufacturers should review standard-product fit versus custom engineering.
- Can you meet the participation conditions?
Compare the notice’s qualification, experience, technical review, maintenance and declaration requirements against your company’s evidence.
- Plan internal approval and submission
Assign owners and dates for obtaining documents, questions, technical submissions, costing, approval and bidding. Review delivery, inspection and warranty conditions before quoting.
取消
募集状況は最終確認時点の公式情報に基づきます。最新の募集条件・締切日時は必ず公式資料をご確認ください。応募手続きは発注機関の公式サイトで行ってください。
- 発注・募集機関
- National Institutes for Quantum Science and Technology, National Research and Development Agency
- 対象施設・計画
- Naka Institute for Fusion Science and Technology
- 公告番号・ロット
- RE-10404
- Type
- 物品・製造
- 技術・業種
- Remote maintenance・Tool fabrication・R&D and technical services
- Notice date
- 2026-10-01
- Web公告掲載開始
- 2026-10-01(日本時間)・時刻未確認
- Web公告掲載終了
- 2026-11-24(日本時間)・時刻未確認
応募・入札の提出締切とは別の項目です。
- 応募・入札書の提出締切
- 提出期限は確認できていません
- 情報の最終確認
- 2026/10/25 00:07(日本時間)
参加資格
応募資格は要確認
Notice cancelled. Original participation conditions were not verified.
Prepare an internal review note
Copies recorded opportunity information and official links. Add owners, product fit, costs and your participation decision internally. No external submission is made.
公式の募集状況
Official PDF confirms cancellation to review the announcement's contents.
状態の確認:2026/10/21 00:05(日本時間)
仕様書・公募要領・関連資料
- Notice of cancellation ↗
- New notice dated October 20, 2026 with the same number and title (separate from the old notice) ↗
- Manufacture of a Maintenance-Tool Prototype for ITER Shield-Block Temporary Plugs ↗ 2026/10/21 00:05(日本時間)
- Notice of cancellation ↗ 2026/10/21 00:05(日本時間)
- Tender notice dated October 20, 2026 (No.22) ↗ 2026/10/21 00:05(日本時間)
終了・取消情報も履歴として保存します。公式ページから見つからなくなったことだけを理由に、取消・終了とは判定しません。
Key points and sources from official procurement notices and calls are summarized in the opportunity information above. Verify the latest conditions in official documents before applying or bidding.