Helix HARUKA

Helical Fusion’s staged demonstration device for high-temperature superconducting magnets and integrated reactor technologies ahead of the planned KANATA power unit.

Read the Japanese original 日本語

Position in the Helix program

Helix HARUKA is Helical Fusion’s intermediate demonstration device. It is intended to validate technologies before the planned Helix KANATA power-producing unit. The published program distinguishes a first phase for magnet testing from a second phase for integrated demonstration. HARUKA’s second phase is explicitly described as having no power generation, an important distinction when comparing it with proposed fusion power plants. Helical Fusion: HARUKA Phase 1 construction site

Phases and location

Phase 1 is located in dedicated joint-research space on the National Institute for Fusion Science campus in Toki, Gifu. Its purpose is to assemble and current-test a non-planar helical high-temperature superconducting magnet; the announced target is energization testing in 2027. Phase 2 would bring together magnets, blanket/divertor technologies and sustained high-temperature plasma operation. Its location was not disclosed in the cited site announcement, and the Phase 1 address should not be assigned to every later phase. Helical Fusion: HARUKA Phase 1 construction site

Manufacturing evidence and limits

Helical Fusion reported completion with RYOKI TOOL of ten coil-case parts and one prototype breeding-blanket component. These provide tangible manufacturing milestones for the hardware program. They do not demonstrate the performance of a fully assembled device, a self-sufficient fuel cycle or net-electric operation. For overseas readers, HARUKA is a useful example of how a reactor-development company connects precision manufacturing to an integrated test platform. Its success will depend on subsequent assembly, testing and validation under the conditions required by the next stage. Helical Fusion: HARUKA components manufactured with RYOKI TOOL

At a glance

Country
Japan
Location
Phase 1: NIFS campus, Toki, Gifu; Phase 2 location not disclosed in the cited announcement
Fusion approach
Helical stellarator
Development stage
Hardware manufacturing and staged demonstration development
Operator
Helical Fusion

Sources & verification

See the primary-source links in the article above.

Information verified: 2026-10-12

Primary-source editorial profile. Reported milestones, work in development and future objectives are distinguished.

Official website ↗

JapanStellaratorSuperconducting magnetsIntegrated demonstration