About the data
FIVE APPROACHES · COMPARE

Compare five fusion approaches

These categories overlap: FRC names a magnetic configuration, while MTF describes compression of magnetized fuel. They are different classification axes, so a compression experiment can also use an FRC.

Compare five fusion approaches
ApproachConfinement or compressionWhat to inspect in 3DReference experiment
Tokamak →Toroidal confinement using external fields and plasma currentTF/PF/CS coils, first wall and divertorITER
Helical / stellarator →Confinement fields shaped by 3D external coilsNon-planar/planar coils, shaped vessel and support ringWendelstein 7-X
Laser fusion →Brief fuel implosion driven by laser light or X raysChamber, beam paths, hohlraum and capsuleNIF
Field-reversed configuration (FRC) →A field-reversed configuration formed by plasma current and external fieldsFormation coils, central compression and injection interfacesHelion Trenta
Magnetized target fusion (MTF) →Compression of magnetized plasma by a liner or other driverMagnetized plasma, solid liner and compression coilsGeneral Fusion LM26

These independently authored educational reconstructions use public references. Static plasma and beam shapes explain positions; they are not field or particle simulations. Devices are not shown at a common scale, and their appearance does not establish power performance.

FUSION INDUSTRY · 3D

Five fusion approaches in 3D

Understand fusion through the positions of magnets, vessels and fuel. Explore all five models, then follow the connections to technology, experiments and industry.