Where could your technology contribute?
Find equipment, materials and services by function, then explore related technologies and companies.
Heating, power supplies, vacuum, measurement and control
Superconductors, magnets, materials and blankets
Fuel cycles, heat exchange, construction and maintenance
| 名称 / 役割 | Country / region | Approach | 確認状況 |
|---|---|---|---|
| Sumitomo Riko Company Limited Company Supplies automotive anti-vibration rubber, hoses and seals, and rubber and resin products for general industry. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Sumitomo Electric Industries, Ltd. Company A manufacturer active in environmental energy, information and communications, automotive products and industrial materials. Its high-temperature superconducting-wire research and development targets applications in magnets for compact fusion reactors. | Japan | — | 2026-10-07 |
| Idemitsu Kosan Co., Ltd. Company Operates energy and materials businesses. Listed as a full member in J-Fusion's official membership directory.Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Sukegawa Electric Co., Ltd. Company Supplies heat and measurement products including thermocouples, heaters and liquid-metal equipment. Presents heat and mass-flow loop test equipment using liquid-metal LiPb and molten-salt FLiNaK, candidate fusion-blanket materials. | Japan | — | 2026-10-07 |
| Sojitz Machinery Corporation Company A machinery trading company within the Sojitz Group. Its current organization was established in 2021. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Deloitte Tohmatsu LLC Company A Japanese entity integrating consulting, financial advisory and risk advisory services. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Yamato Gokin Co., Ltd. Company Provides products and services relating to specialty copper alloys and casting dies. Official information describes its involvement in chromium-copper pipe materials used to cool the ITER divertor. | Japan | — | 2026-10-07 |
| Dainippon Dia Consultants Co., Ltd. Company Provides construction consulting, surveying and geological investigations for social infrastructure development. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| FUJIFILM Corporation Company Provides products and services in healthcare, electronics and imaging. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Fuji Electric Co., Ltd. Company Operates in energy, industry and other sectors based on power semiconductors and power electronics. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Yamashina Seiki Co., Ltd. Company Manufactures and sells special-purpose machine tools, heat exchangers for ships and power plants, lubricators and medical equipment. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Kawasaki Heavy Industries, Ltd. Company A diversified heavy-industry company with headquarters in Tokyo and Kobe, operating across aerospace, railways, energy and other fields. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |