About the data

Sukegawa Electric Co., Ltd.

Supplies heat and measurement products including thermocouples, heaters and liquid-metal equipment. Presents heat and mass-flow loop test equipment using liquid-metal LiPb and molten-salt FLiNaK, candidate fusion-blanket materials.

Official company website ↗
Published Updated Translation reviewed
Share this article
Read the Japanese original

Company profile

Official name
Sukegawa Electric Co., Ltd.
English name
Not confirmed
Location
Ibaraki Prefecture
Founded (official terminology)
1949
Industry
Thermal measurement・Test equipment
Technology field
Liquid metals・Blanket testing
Type of involvement
Association membership・Research and development

Role in the fusion industry

Presents heat and mass-flow loop test equipment using liquid-metal LiPb and molten-salt FLiNaK, candidate fusion-blanket materials.

Key products and technologies

Not confirmed

Disclosed involvement and track record

Association membership

Listed under the name Sukegawa Electric Co., Ltd. as a supporting member in the J-Fusion membership directory as of September 17, 2026.

Association membership does not establish a record of supplying or delivering equipment to a specific device.

J-Fusion membership directory ↗
Technology development

Presents heat and mass-flow loop test equipment using liquid-metal LiPb and molten-salt FLiNaK, candidate fusion-blanket materials.

Heat and mass-flow loop equipment ↗

Related projects

A relationship with a specific project has not been verified.

Sources for company information

Last verified: 2026/10/12 20:18:37 (Japan time)

Business overview

Supplies heat and measurement products including thermocouples, heaters and liquid-metal equipment. Presents heat and mass-flow loop test equipment using liquid-metal LiPb and molten-salt FLiNaK, candidate fusion-blanket materials.

Relationship with the fusion industry

Presents heat and mass-flow loop test equipment using liquid-metal LiPb and molten-salt FLiNaK, candidate fusion-blanket materials.

Verified involvement

Listed under the name Sukegawa Electric Co., Ltd. as a supporting member in the J-Fusion membership directory as of September 17, 2026.

Presents heat and mass-flow loop test equipment using liquid-metal LiPb and molten-salt FLiNaK, candidate fusion-blanket materials.

How to interpret this information

Membership, research and development, orders, deliveries, investment and lending are different forms of involvement. Future power-generation or commercialization targets are not achieved results. Items not listed have not been verified.

Sources

Companies DATA

Country
Japan

Check the official information

Share this article