Where could your technology contribute?
Find equipment, materials and services by function, then explore related technologies and companies.
Heating, power supplies, vacuum, measurement and control
Superconductors, magnets, materials and blankets
Fuel cycles, heat exchange, construction and maintenance
| 名称 / 役割 | Country / region | Approach | 確認状況 |
|---|---|---|---|
| Sompo Japan Insurance Inc. Company Provides non-life insurance services for businesses and individuals within the SOMPO Group. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Shin Mutsu Ogawara Co., Ltd. Company Holds, develops and sells land on an integrated basis for development of the Mutsu-Ogawara area. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| JGC Corporation Company A JGC Group operating company responsible for engineering, procurement and construction of plants and facilities outside Japan. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| JGC Japan Corporation Company A JGC Group company responsible for engineering, procurement, construction and maintenance of plants and facilities in Japan. Listed as a special member in J-Fusion's official membership directory.Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Nissin Electric Co., Ltd. Company Operates businesses in power and environmental systems, beam and plasma technologies, and equipment-component solutions. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Niterra Co., Ltd. Company Manufactures and sells spark plugs, internal-combustion-engine products and advanced-ceramics applications. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Japan Superconductor Technology, Inc. Company Researches and develops ultrafine superconducting intermetallic wire. Its NEDO-selected project addresses wire-manufacturing technologies targeting flexibility and low AC losses. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Nippon Sanso Corporation Company Supplies industrial gases such as oxygen and nitrogen and related technologies and equipment. Renamed from Taiyo Nippon Sanso in April 2026. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Nitto Optical Co., Ltd. Company Specializes in processing optical prisms, mirrors, filters and lenses. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Nippon Steel Chemical & Material Co., Ltd. Company A Nippon Steel Group company operating in coal chemicals, chemical products, resins and substrate materials. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Nippon Steel Kowa Real Estate Co., Ltd. Company Develops, leases and manages offices, housing, logistics and commercial facilities. The entity was established in 1997. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Asahi Kasei Corporation Company A chemical manufacturer operating in materials, housing and healthcare. Listed as a full member in J-Fusion's official membership directory.Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |