Where could your technology contribute?
Find equipment, materials and services by function, then explore related technologies and companies.
Heating, power supplies, vacuum, measurement and control
Superconductors, magnets, materials and blankets
Fuel cycles, heat exchange, construction and maintenance
| 名称 / 役割 | Country / region | Approach | 確認状況 |
|---|---|---|---|
| Canadian Nuclear Laboratories (CNL) Research institutions CNL operates Canadian nuclear-research infrastructure and studies tritium separation, recovery, storage and material permeation for future fusion fuel systems. | Canada | Tritium, hydrogen isotopes and materials testing | 2026-10-07 |
| National Nuclear Energy Commission (CNEN) Public institutions Brazil’s public nuclear institution connects a fusion research network with planned LFN facilities and a superconducting tokamak concept. Its relationship with INPE remains transitional. | Brazil | Fusion-research coordination and future facilities | 2026-10-07 |
| Southwestern Institute of Physics (SWIP) Research institutions SWIP’s HL-3 plasma research and ITER wall-conditioning engineering, with results separated from plans. | China | Tokamak and fusion engineering | 2026-10-07 |
| Korea Institute of Fusion Energy (KFE) Research institutions KFE’s role in KSTAR operation, instability control, ITER participation and future reactor technology. | South Korea | Superconducting tokamak and fusion engineering | 2026-10-07 |
| Institute for Plasma Research (IPR) Research institutions IPR’s history, ADITYA-U and SST-1, cryogenics, heating technologies and industrial plasma applications. | India | Tokamak and plasma research | 2026-10-07 |
| Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP) Research institutions ASIPP’s plasma research and fusion engineering across EAST, CRAFT, BEST and ITER contributions. | China | Tokamak and fusion engineering | 2026-10-07 |
| Institute of Plasma Physics and Laser Microfusion (IPPLM) Compare Poland’s IPPLM research in magnetic confinement, laser plasmas and PF-1000U, including diagnostics, materials tests and the meaning of pulsed neutron results. | Poland | Magnetic confinement, laser and high-power pulsed plasmas | 2026-10-30 |
| IFMIF-DONES España Explore Spain’s IFMIF-DONES delivery consortium, accelerator–lithium materials irradiation, construction and operating responsibilities, and international governance. | Spain | Accelerator-driven neutron irradiation of fusion materials | 2026-10-30 |
| DTT Consortium (DTT S.c. a r.l.) Meet the company delivering Italy’s DTT heat-exhaust facility: its ENEA relationship, participating institutions, tokamak design and divertor research goals. | Italy | Superconducting tokamak and divertor heat-exhaust experiments | 2026-10-30 |
| LPPFusion Companies New Jersey-based LPPFusion researches Focus Fusion, combining a dense plasma focus (DPF) with hydrogen–boron-11 fuel. Its current experimental device is FF-2B, incorporating changes including electrode materials from the earlier FF-1. The official technology description frames the work as seeking scientific feasibility, not offering a commercial electricity generator for sale. | — | — | 2026-10-07 |
| UK Fusion Energy (UKFE) What does STEP delivery company UKFE integrate? Its relationship with UKAEA, renaming from UKIFS, and challenges of net power, fuel self-sufficiency and availability. | United Kingdom | Whole-plant integration for the STEP spherical tokamak | 2026-10-30 |
| HUN-REN Centre for Energy Research (EK-CER) Understand Hungary’s HUN-REN Centre for Energy Research through plasma diagnostics, control, and contributions to ITER, EUROfusion and DONES. | Hungary | Plasma diagnostics, control and fusion engineering | 2026-10-30 |