About the data
FUSION SUPPLY CHAIN

Where could your technology contribute?

Find equipment, materials and services by function, then explore related technologies and companies.

01 Create the plasma

Heating, power supplies, vacuum, measurement and control

02 Confine and extract

Superconductors, magnets, materials and blankets

03 Support the power plant

Fuel cycles, heat exchange, construction and maintenance

191 entries (showing 37–48)
名称 / 役割Country / regionApproach確認状況
Dutch Institute for Fundamental Energy Research (DIFFER)

Can fusion walls withstand heat and particles? Explore DIFFER’s Magnum-PSI, ion-beam facilities, materials modelling and role within NWO-I.

NetherlandsLinear plasma and plasma-facing materials
2026-10-30
Helicity Space
Companies

Helicity Space is a US fusion-propulsion developer, founded in 2018 according to investor Urania. Its pulsed-plasma Helicity Drive concept faces different requirements from companies targeting electricity sales to terrestrial grids. Investor assessments and predicted journey times are not flight-demonstrated performance.

——
2026-10-07
Institute of Plasma Physics, Czech Academy of Sciences (IPP CAS)

From COMPASS to COMPASS-U: Czech IPP’s research history, high-field tokamak design and STEAM heat-exhaust tests, with results distinguished from design goals.

Czech RepublicTokamak physics, plasma exhaust and materials testing
2026-10-30
Italian National Agency for New Technologies, Energy and Sustainable Economic Development (ENEA)

Explore ENEA’s Frascati heritage, its distinct relationship with the DTT Consortium, and work on plasma physics, materials, fuel, neutron testing and industrial supply chains.

ItalyMagnetic confinement, fusion engineering and inertial confinement
2026-10-30
Thea Energy
Companies

Thea Energy develops planar-coil stellarators with individually controlled magnets. Explore Canis testing, Eos development and the Helios plant concept, including the engineering gaps between them.

——
2026-10-07
UK Atomic Energy Authority (UKAEA)

Distinguish UKAEA, UK Fusion Energy and STEP, and explore how plasma exhaust, fuel, materials, robotics and JET decommissioning contribute to future fusion plants.

United KingdomSpherical tokamak, fuels, materials and remote maintenance
2026-10-30
CEA Institute for Research into Fusion by Magnetic Confinement (IRFM)

Understand IRFM’s place within CEA, what WEST’s 1,337-second discharge and 2026 H-mode result establish, and how wall, heat-exhaust and control research supports ITER.

FranceTokamak; sustained plasma operation, heat exhaust and in-vessel components
2026-10-30
Swiss Plasma Center (EPFL SPC)

Explore EPFL SPC’s TCV plasma-shaping and control research, SULTAN/EDIPO conductor tests, institutional history and role in European fusion collaboration.

SwitzerlandTCV tokamak and superconducting-conductor testing
2026-10-30
GenF
Companies

GenF is a Thales-related company based in Le Barp in south-western France. It aims to take laser inertial fusion from research toward industrial reactors. CEA’s CESTA and Laser Mégajoule are nearby, with CELIA part of the regional research environment. Access to such expertise is not evidence that GenF has completed a power reactor; public laboratories and companies have different roles.

——
2026-10-07
Fusion for Energy (F4E)
Public organizations and research institutes

Understand F4E’s role in ITER delivery, EU–Japan Broader Approach projects and IFMIF-DONES, and how fusion research becomes industrial engineering.

Spain (European joint undertaking)ITER procurement, EU–Japan BA and materials research infrastructure
2026-10-07
European Atomic Energy Community (Euratom)
Public organizations and research institutes

Understand Euratom as a treaty-based community, its role in ITER, the distinct work of F4E and EUROfusion, and the scope of 2026–2027 research funding.

Europe (international community)International cooperation, research funding and nuclear institutional framework
2026-10-07
Xcimer Energy
Companies

Xcimer Energy combines KrF lasers and a liquid-wall fusion concept. Explore the Phoenix laser prototype and the distinct future stages Anvil, Vulcan and Athena.

——
2026-10-07