About the data
FUSION SUPPLY CHAIN

Where could your technology contribute?

Find equipment, materials and services by function, then explore related technologies and companies.

01 Create the plasma

Heating, power supplies, vacuum, measurement and control

02 Confine and extract

Superconductors, magnets, materials and blankets

03 Support the power plant

Fuel cycles, heat exchange, construction and maintenance

191 entries (showing 13–24)
名称 / 役割Country / regionApproach確認状況
Avalanche Energy
Fusion development, high voltage and neutron applications

Avalanche’s Orbitron, Hammerhead, Jyn, Lando and FusionWERX: distinguish measured experiments, licensed limits, product availability and future fusion power.

United StatesOrbitron: compact fusion using electric and magnetic fields. Jyn: centrifugal mirror experiment.
2026-10-07
Realta Fusion
Fusion companies

Realta Fusion connects magnetic-mirror experiments, industrial heat and electricity ambitions, and a growing supply chain; explore WHAM, DEC, Forge and its development roadmap.

United StatesMagnetic mirror / tandem mirror
2026-11-03
Zap Energy
Fusion companies

Understand Zap Energy’s sheared-flow Z pinch, FuZE-Q research, Century engineering, pulsed power and fission–fusion strategy, separating results from targets.

United StatesSheared-flow-stabilized Z pinch
2026-10-30
Astral Systems
Companies

Explore Astral’s compact neutron sources, irradiation services and UKAEA research work, distinguishing neutron energy and flux from net electricity.

——
2026-10-07
National Nuclear Center of Kazakhstan (NNC)
Research institution

Kazakhstan’s national research center uses the KTM tokamak to investigate plasma-facing materials, replaceable divertor components and the thermal challenges of future fusion systems.

KazakhstanTokamak / plasma-facing materials
2026-10-07
National Research Centre Kurchatov Institute
Research institution

Russia’s Kurchatov Institute operates T-15MD, a tokamak research platform. Its contribution spans plasma confinement, heating, current drive and diagnostics relevant to ITER and future systems.

RussiaTokamak / heating, current drive and diagnostics
2026-10-07
Thailand Institute of Nuclear Technology (TINT)
Research institution

Thailand’s public nuclear technology institute uses TT-1 as a research and training platform, linking international technical cooperation with a developing national fusion strategy.

ThailandTokamak / plasma research and training
2026-10-07
Australian Nuclear Science and Technology Organisation (ANSTO)
Research institution

ANSTO contributes materials science and advanced characterization to fusion research. Its role links irradiation, neutron and synchrotron methods with international collaboration—not ownership of a fusion power plant.

AustraliaMaterials research / irradiation and characterization
2026-10-07
Princeton Plasma Physics Laboratory (PPPL)
Research institutions

Managed by Princeton for DOE, PPPL studies plasma science and spherical tokamaks. NSTX-U’s 2026 magnet delivery precedes experiments expected in 2027.

United StatesSpherical tokamak and plasma science
2026-10-07
Lawrence Livermore National Laboratory (LLNL)
Research institutions

LLNL hosts NIF, which achieved fusion ignition. Its national-security science mission and inertial-fusion results are distinct from demonstrated commercial electricity.

United StatesInertial confinement fusion and high-energy-density science
2026-10-07
National Institute for Space Research (INPE)
Research institutions

Brazil’s INPE developed the ETE spherical tokamak. Its fusion research began in 1986; the profile distinguishes historical experiments from the gradual CNEN transition.

BrazilSpherical tokamak and plasma diagnostics
2026-10-07
Fusion Energy Sciences (FES)
Public institutions

DOE’s FES program supports plasma science, materials, burning plasmas and fuel-cycle research, coordinating with the distinct Office of Fusion.

United StatesFusion and plasma-science research support
2026-10-07