About the data
FUSION SUPPLY CHAIN

Where could your technology contribute?

Find equipment, materials and services by function, then explore related technologies and companies.

01 Create the plasma

Heating, power supplies, vacuum, measurement and control

02 Confine and extract

Superconductors, magnets, materials and blankets

03 Support the power plant

Fuel cycles, heat exchange, construction and maintenance

191 entries (showing 145–156)
名称 / 役割Country / regionApproach確認状況
Fujikura Ltd.
Company

Supplies optical communications products, electronic components, electric wire, and high-temperature superconducting wire and coils. Announced a long-term supply agreement for high-temperature superconducting wire for CFS's ARC development in September 2026. The contracted quantity is not the quantity already delivered.

Japan—
2026-10-07
Macnica, Inc.
Company

Supplies semiconductors, electronic components and networking products, and provides development and technical support. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Metrol Co., Ltd.
Company

Develops, manufactures and sells high-precision industrial sensors for factory automation. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Resonac Corporation
Company

An operating company manufacturing and selling functional chemicals and materials, including semiconductor materials. It is a J-Fusion member; specific fusion-equipment deliveries or demonstration results have not been verified in this dataset.

Japan—
2026-10-07
MUFG Bank, Ltd.
Company

Provides financial services in Japan and overseas as a bank within Mitsubishi UFJ Financial Group. In September 2025 it participated in a syndicated loan to Kyoto Fusioneering with JBIC, supporting construction funding for the UNITY-2 fuel-cycle demonstration facility and other purposes.

Japan—
2026-10-07
Mitsui O.S.K. Lines, Ltd.
Company

Operates a large fleet and businesses centered on international shipping. In September 2025 it announced investment in Commonwealth Fusion Systems through its wholly owned subsidiary MOL Switch.

Japan—
2026-10-07
HORIBA, Ltd.
Company

Develops analytical, measurement and control instruments for energy and the environment, biotechnology and healthcare, and advanced materials and semiconductors. Through HONMAMON co-creation research with Kyoto University, it supports optical plasma-measurement research for fusion.

Japan—
2026-10-07
Obayashi Corporation
Company

Undertakes building and civil construction and technology development. Listed as a full member in J-Fusion's official membership directory.Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Hazama Ando Corporation
Company

Provides civil and building design and construction, environmental technologies, real estate and infrastructure services. Listed as a full member in J-Fusion's official membership directory.Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Shimadzu Corporation
Company

A measurement-instrument manufacturer headquartered in Kyoto. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Japan Environment Research Co., Ltd.
Company

Provides environmental surveys, radiation management and measurement, and management and related construction work for facilities handling radioactive materials. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Hitachi, Ltd.
Company

Manufactures and delivers power supplies and superconducting coils for fusion research. Participates in ITER-related equipment development and construction and modification of the Large Helical Device, and developed a divertor prototype with QST.

Japan—
2026-10-07