About the data
FUSION SUPPLY CHAIN

Where could your technology contribute?

Find equipment, materials and services by function, then explore related technologies and companies.

01 Create the plasma

Heating, power supplies, vacuum, measurement and control

02 Confine and extract

Superconductors, magnets, materials and blankets

03 Support the power plant

Fuel cycles, heat exchange, construction and maintenance

191 entries (showing 157–168)
名称 / 役割Country / regionApproach確認状況
Murata Manufacturing Co., Ltd.
Company

Researches, develops, manufactures and sells electronic devices based on functional ceramics. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Toshiba Corporation
Company

Provides products and services in energy, social infrastructure and devices. Announced successful cryogenic energization testing at the ITER site of an ITER superconducting toroidal-field coil manufactured with QST.

Japan—
2026-10-07
Watanabe Shoko Co., Ltd.
Company

A specialist trading company primarily handling semiconductor-manufacturing products, also drawing on group manufacturing and logistics capabilities. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Takenaka Corporation
Company

Provides building and civil-engineering contracting, design, supervision and related engineering. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Toyota Industries Corporation
Company

Manufactures and sells textile machinery, industrial vehicles, automobiles and automotive components. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Nomura Research Institute, Ltd.
Company

Provides consulting, IT solutions for financial and industrial sectors, and IT infrastructure services. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Haseko Corporation
Company

Operates in construction, real estate and engineering. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Morita Chemical Industries Co., Ltd.
Company

Manufactures chemicals including hydrofluoric acid and fluorine compounds, and provides related import, export and analytical services. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Yokogawa Electric Corporation
Company

Uses measurement, control and information technologies to support plant control and operational monitoring. The entity was established in 1920. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Shimizu Corporation
Company

Builds on building and civil construction to operate in real-estate development, engineering and energy development. Listed as a special member in J-Fusion's official membership directory.Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Shibaura Machine Co., Ltd.
Company

Manufactures molding machines, machine tools, ultraprecision machining equipment and industrial robots, and provides engineering and maintenance services. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
RYOKI GLOBAL TOOLING Co., Ltd.
Company

A large-scale precision-machining manufacturer producing aircraft components, aerospace tooling, contract measurement and tooling MRO services, and industrial equipment parts. It manufactures fusion-device components in collaboration with Helical Fusion.

Japan—
2026-10-07