Where could your technology contribute?
Find equipment, materials and services by function, then explore related technologies and companies.
Heating, power supplies, vacuum, measurement and control
Superconductors, magnets, materials and blankets
Fuel cycles, heat exchange, construction and maintenance
| 名称 / 役割 | Country / region | Approach | 確認状況 |
|---|---|---|---|
| MiRESSO Co., Ltd. Company A QST-certified startup developing low-temperature refining of beryllium for fusion. It started full-scale construction of the BETA production-demonstration facility in October 2026. This is distinct from mass-production or supply achievements. | Japan | — | 2026-10-07 |
| SCREEN Holdings Co., Ltd. Company A holding company responsible for managing the SCREEN Group. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Mizuho Bank, Ltd. Company A bank with a domestic and international network. Its current organization was launched in July 2013. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| ATOX Co., Ltd. Company Provides nuclear-facility maintenance, installation work, radiation protection and life-science services. Listed as a special member in J-Fusion's official membership directory.Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| A.L.M.T. Corp. Company Supplies refractory metals such as tungsten and molybdenum and related processed products. Reported completing delivery of approximately 32,000 tungsten monoblocks for 13 ITER inner vertical targets to RI in November 2025. | Japan | — | 2026-10-07 |
| OKM Corporation Company Develops, manufactures and sells valves for industrial, building and marine applications. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Kiguchi Technics Inc. Company A contract-testing company providing sample preparation, test-specimen machining, materials testing and microstructural evaluation. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Sugino Machine Limited Company Develops and manufactures high-pressure-water cleaning and cutting equipment, machining equipment, and inspection and maintenance equipment for nuclear facilities. With Helical Fusion, it completed a high-temperature superconducting coil-manufacturing machine for Helix HARUKA. It also began manufacturing initial ITER blanket-assembly tools with QST and Sojitz Machinery. | Japan | — | 2026-10-07 |
| CHINO Corporation Company Provides measurement and control instruments, with a focus on temperature. Listed as a full member in J-Fusion's official membership directory.Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Tokuyama Corporation Company A chemical manufacturer active in advanced electronic materials, life sciences, environmental products and chemicals. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| VALQUA, LTD. Company Designs, manufactures and processes material products such as fluoropolymers and high-performance rubber for a wide range of industries. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset. | Japan | — | 2026-10-07 |
| Beam for Fusion Co., Ltd. Company Applies ion-source and high-energy, high-current beam technologies to fusion and neutron sources. Its stated businesses include fusion-plasma design and the design and manufacture of plasma-heating equipment, particularly neutral-beam systems. | Japan | — | 2026-10-07 |