TCV(Tokamak à Configuration Variable)
Study plasma confinement and control in a variable-configuration tokamak to inform ITER and DEMO design.
Read the Japanese originalProject profile
Research results, fusion power, net electricity generation and commercialization are distinguished. Future operating dates and power levels are targets announced by the operator.
- Official name
- TCV(Tokamak à Configuration Variable)
- Operator
- EPFL Swiss Plasma Center
- Operator type
- Public institution / university
- Host country
- Switzerland
- Host location
- EPFL, Lausanne
- Category
- Research device
- Technical approach
- Tokamak
- Development stage
- Research operation
Development stage note: Development or operating stage reported in published sources; this does not guarantee the machine's operating status on the verification date.
Research and development objectives
Study plasma confinement and control in a variable-configuration tokamak to inform ITER and DEMO design.
Verified milestones
- 1992-11 · Achievement or implementation verified
Operation began in Lausanne.
Announced future targets
- Target date not verified · Announced target (not achieved)
Study fusion-plasma physics and future reactor design.
Published technical specifications
| Item | Published value | Meaning, conditions and sources of values |
|---|---|---|
| Major radius | 0.88 m | Published machine parameter from an older facility introduction; distinct from the latest additional-heating specifications |
| Maximum toroidal magnetic field | 1.54 T | Published design value |
Companies with verified involvement
No relationship has yet been verified by matching the sources with the company database.
Related in-depth FI articles
No existing article focused on this project has been verified.
Verification scope and classification notes
- Editorial classification of the purpose described in official sources; not necessarily the operator's formal classification.
- No item was verified in this review. This does not establish that none exists or that it is undisclosed.
Official project information ↗
- TCV tokamak(EPFL)
Verified: 2026-10-12 - TCV short presentation(EPFL)
Verified: 2026-10-12
Last verified: 2026/10/12 20:28:19 (Japan time)
Research and development purpose
Study plasma confinement and control in a variable-configuration tokamak to inform ITER and DEMO design.
Research stages, achievements, announced targets and technical specifications are organized in the project profile above. Check the sources for each item.