About the data

FuZE-3

Zap Energy's three-electrode Z-pinch research machine independently controls plasma acceleration and compression to study improvements in the fusion triple product.

Published Updated Translation reviewed
Share this article
Read the Japanese original
Focus: Zap Energy's three-electrode Z-pinch device. Plasma acceleration and compression controlled separately to study improvements in the fusion triple product. Reading perspective: R&D purpose: separate acceleration and compression to raise density, pressure and triple product. Stages, targets and specs are in the project profile above. Check sources for each item…
Diagram summarizing the article’s key points.Diagram: FUSION INDUSTRY
PROJECT DATABASE

Project profile

Research results, fusion power, net electricity generation and commercialization are distinguished. Future operating dates and power levels are targets announced by the operator.

Official name
Fusion Z-pinch Experiment 3(FuZE-3)
Operator
Zap Energy
Operator type
Private company
Host country
Not confirmed
Host location
Installation country and city were not verified in this review
Category
Research device
Technical approach
Sheared-flow-stabilized Z-pinch
Development stage
Research operation

Development stage note: Development or operating stage reported in published sources; this does not guarantee the machine's operating status on the verification date.

Research and development objectives

Independently control acceleration and compression to raise plasma density, pressure and the fusion triple product.

Verified milestones

  1. 2025-11-17 · Achievement or implementation verified

    Operation of the new machine and high-pressure plasma measurements announced.

Announced future targets

Specific dates or targets have not been verified.

Published technical specifications

ItemPublished valueMeaning, conditions and sources of values
Number of electrodes3 unitsMachine configuration
Number of capacitor banks2 unitsMachine configuration
Total plasma pressure2.6 GPaUpdated value from the research lead, linked from the official website in 2026 and explicitly identified as not yet peer reviewed.

Companies with verified involvement

No relationship has yet been verified by matching the sources with the company database.

Related in-depth FI articles

No existing article focused on this project has been verified.

Verification scope and classification notes
  • Do not infer the machine's installation country from the developer's U.S. office when mapping it.
  • No primary source explicitly identifying the machine's location was verified.
  • Editorial classification of the purpose described in official sources; not necessarily the operator's formal classification.
  • No item was verified in this review. This does not establish that none exists or that it is undisclosed.
  • The 1.6 GPa figure from 2025 is total pressure assuming equal electron and ion temperatures. The newer 2.6 GPa figure is also a preliminary company report, not a peer-reviewed result.

Official project information ↗

Sources for project information

Last verified: 2026/10/12 20:22:07 (Japan time)

Explore and compare projects worldwide →

Research and development purpose

Independently control acceleration and compression to raise plasma density, pressure and the fusion triple product.

Research stages, achievements, announced targets and technical specifications are organized in the project profile above. Check the sources for each item.

Focus: Zap Energy's three-electrode Z-pinch device. Plasma acceleration and compression controlled separately to study improvements in the fusion triple product. Reading perspective: R&D purpose: separate acceleration and compression to raise density, pressure and triple product. Stages, targets and specs are in the project profile above. Check sources for each item…
Diagram summarizing the article’s key points.Diagram: FUSION INDUSTRY

Check the official information

Share this article