About the data

Fuse

Fuse is a US company developing pulsed-power hardware and radiation-testing capabilities alongside its fusion-energy ambitions. Its initial business is therefore different from selling electricity from a fusion plant.

Official company website ↗
Published Updated Translation reviewed
Share this article
Read the Japanese original

Company profile

Official name
Fuse
English name
Fuse
Location
United States
Year established
Not confirmed
Industry
Pulsed-power systems・Radiation testing
Technology field
Pulsed power・Dense plasma focus・Z-pinch
Type of involvement
Equipment development・Testing services・Joint research

Role in the fusion industry

Fuse is a US company developing pulsed-power hardware and radiation-testing capabilities alongside its fusion-energy ambitions. Its initial business is therefore different from selling electricity from a fusion plant.

Key products and technologies

  • TITAN (pulsed-power driver)
  • FAETON-I (fusion radiation source)

Disclosed involvement and track record

Joint research

Announced a CRADA with Los Alamos National Laboratory on 16 July 2025 for pulsed-power hardware evaluation and target development. This is joint research, not commercial electricity generation.

Fuse — Los Alamos CRADA announcement ↗

Related projects

A relationship with a specific project has not been verified.

Sources for company information

Last verified: 2026/10/30 12:44:00 (Japan time)

Pulsed power before electricity sales

Fuse is a US company developing pulsed-power hardware and radiation-testing capabilities alongside its fusion-energy ambitions. Its initial business is therefore different from selling electricity from a fusion plant. [1]

What TITAN's terawatts mean

TITAN is an impedance-matched Marx generator, or IMG. Its terawatt-scale figure describes short-pulse peak driver power, not continuous electricity generated by fusion. Efficient energy delivery to a load is also a different metric from fusion gain. [2]

Collaboration with Los Alamos

On 16 July 2025, Fuse announced a CRADA with Los Alamos National Laboratory covering hardware evaluation and target development with specialists in plasma, radiation and energy output. The agreement does not establish commercial reactor performance. [3]

A driver and a radiation source have different jobs

TITAN delivers electrical pulses to a load; FAETON-I is a dense-plasma-focus fusion radiation source. Driver images or waveforms do not establish fusion output or plant energy balance. Conversely, useful neutron testing need not require net electricity generation. Distinguishing the product clarifies the current business and future ambition. [2][4]

Peak power is not energy delivered

Power is the rate of energy transfer. A hypothetical rectangular 1 TW pulse lasting 100 ns would contain 100 kJ. Real waveforms need not be rectangular, so this calculation is not TITAN's measured energy. FI uses it to explain why a terawatt headline alone says nothing about electricity supplied to a city. In a test facility, pulse power describes an input condition rather than generated energy. [2]

Interpreting 0.01 Hz

FAETON's page advertises a 0.01 Hz cycle and automated acquisition—roughly one shot per 100 seconds. That does not specify continuous operating time or shot success rate. Repeatable conditions, sample exposure and comparable diagnostics matter for a test service. A total neutron count alone cannot establish radiation tolerance for every component. [4]

Experience versus a reactor leap

FI's assessment: pulsed-power and testing work can build capabilities relevant to future drivers. Scaling electrical equipment does not guarantee proportionate fusion output. Fuel compression, stability, repeatable targets, heat extraction and maintenance require further assessment. LANL collaboration belongs in this development context, not as a guarantee of unknown reactor performance. [3]

Industrial significance

FI's assessment: switch life, synchronization, facility operation and credible measurements are useful indicators. Testing-business experience and fusion-fuel performance should be tracked separately. Conflicting device dates on the homepage prevent treating its timeline as a definitive schedule. The founding year was not established here.

Sources

1 2 3 4

Check the official information

Share this article