About the data

Licube KK

Licube’s Japanese entity develops lithium-refining technology using electrodialysis and LLTO solid electrolytes. The roles and announcements of the Japanese and US entities are distinguished.

Official company website ↗
Published Updated Translation reviewed
Share this article
Read the Japanese original

Company profile

Official name
Licube KK
English name
Licube KK
Location
Aomori Prefecture
Year established
Not confirmed
Industry
Lithium・Materials refining
Technology field
Electrodialysis・LLTO solid electrolytes・Lithium refining
Type of involvement
Association membership・Technology development

Role in the fusion industry

Develops lithium-related materials technology; J-Fusion membership is documented in previously verified sources. The Japanese entity participates in NEDO’s US lithium-refining demonstration, which is not proof of fusion-device delivery or isotope-enrichment performance.

Key products and technologies

  • Licube group announcement: 4N5 lithium carbonate (samples; pilot scale)

Disclosed involvement and track record

Association membership

Listed under the name Licube KK as a supporting member in the J-Fusion membership directory as of September 17, 2026.

Association membership does not establish a record of supplying or delivering equipment to a specific device.

J-Fusion membership directory ↗
Technology development

NEDO’s list updated October 23, 2026 identifies an ongoing FY2025–FY2029 US demonstration of electrodialysis refining equipment for oilfield-derived crude lithium by リキューブ(株) and Licube Texas LLC. Lithium-refining demonstration is distinct from fusion-device delivery, electricity generation and isotope-enrichment validation.

NEDO: ongoing international demonstration projects ↗ Licube: lithium-refining project enters demonstration phase ↗

Related projects

A relationship with a specific project has not been verified.

Sources for company information

Last verified: 2026/10/27 19:26:00 (Japan time)

Business overview

Licube KK is Licube’s Japanese entity, working on lithium-refining technology. The official website lists it separately from US-based Licube, Inc. Group announcements should not automatically be attributed to the Japanese entity alone.

Company facts

The Japanese entity is Licube KK, with a Japanese base in Hirosaki, Aomori. Its work concerns lithium refining using electrodialysis and LLTO solid electrolytes.

  • Japanese entity: リキューブ株式会社 / Licube KK
  • Japanese location: Within Hirosaki University’s Research Promotion Department, Hirosaki, Aomori, as listed officially
  • Core technologies: Electrodialysis and lithium refining using LLTO solid electrolytes
  • Connection to fusion: Lithium-related materials and J-Fusion membership
  • Demonstration verified in primary sources: Refining equipment for crude lithium derived from oilfield produced water in the United States

Selecting lithium using electricity

Licube describes a platform combining electrodialysis with lithium lanthanum titanate (LLTO) solid electrolytes. Electrical driving forces and materials that selectively transmit lithium ions are used to separate lithium from impurities.

The company says it has begun pilot-scale production and sample supply of lithium carbonate with 4N5 purity, at least 99.995%. This is its statement about product development, not proof of mass-production scale.

A US demonstration using oilfield produced water

NEDO’s project list, updated on October 23, 2026, identifies an ongoing demonstration of electrodialysis refining equipment for crude lithium derived from oilfield produced water. The recipients are listed as “リキューブ(株)” and “Licube Texas LLC”; the partner country is the United States and the project years are FY2025–FY2029.

Licube announced entry into the demonstration phase on the same date. The project concerns lithium-refining equipment, not operation of a fusion reactor or successful fusion electricity generation.

What its connection to fusion does—and does not—mean

For deuterium–tritium (D–T) fusion, securing tritium fuel is an important challenge. ITER plans to test breeding blankets that produce tritium through reactions between lithium and neutrons. That fuel-supply role connects lithium to the fusion industry.

Removing chemical impurities and increasing the proportion of a particular isotope, such as lithium-6, are different technical tasks. A product purity of 99.995% does not by itself establish lithium-6 enrichment, fusion-sector supply volumes or performance in an operating reactor.

The J-Fusion membership directory dated September 17, 2026 lists Licube KK. However, the primary sources cited here do not establish deliveries by the Japanese entity to a named fusion device or achieved fusion-specific isotope-enrichment values. Progress in materials technology and deployment in fusion must be tracked separately.

Recent developments and what to watch

On October 13, 2026, Licube announced its selection for TechCrunch Disrupt’s Startup Battlefield Top 20. This is an opportunity to present its technology and business, not certification that fusion technology is complete. Future evidence to follow includes refining-demonstration results, product specifications, supply scale and specific contracts or tests for fusion applications.

Sources

Companies DATA

Country
Japan

Check the official information

Share this article