About the data

Heliotron J

Study simultaneous particle confinement and plasma stability by optimizing a helical-axis heliotron magnetic field.

Published Updated Translation reviewed
Share this article
Read the Japanese original
Focus: Optimizes helical-axis heliotron fields to combine particle confinement and plasma stability. Reading perspective: R&D purpose: optimize helical-axis heliotron fields for both particle confinement and plasma stability. Stages, results, targets and specs are in the project profile above…
Diagram summarizing the article’s key points.Diagram: FUSION INDUSTRY
PROJECT DATABASE

Project profile

Research results, fusion power, net electricity generation and commercialization are distinguished. Future operating dates and power levels are targets announced by the operator.

Official name
Heliotron J
Operator
Institute of Advanced Energy, Kyoto University
Operator type
Public institution / university
Host country
Japan
Host location
Kyoto University Uji Campus, Uji, Kyoto
Category
Research device
Technical approach
Heliotron
Development stage
Research operation

Development stage note: Development or operating stage reported in published sources; this does not guarantee the machine's operating status on the verification date.

Research and development objectives

Study simultaneous particle confinement and plasma stability by optimizing a helical-axis heliotron magnetic field.

Verified milestones

  1. 2000 · Achievement or implementation verified

    Full-scale plasma experiments began.

  2. Date not verified · Achievement or implementation verified

    A multipoint microwave diagnostic developed jointly by Kyoto University, Mitsubishi Electric and NIFS was demonstrated on the machine; announced on 30 June 2026.

Announced future targets

  • Target date not verified · Announced target (not achieved)

    Investigate confinement and control in advanced magnetic configurations.

Published technical specifications

ItemPublished valueMeaning, conditions and sources of values
Major radius1.2 mPublished machine parameter
Magnetic field strength<1.5 TPublished machine parameter

Companies with verified involvement

Related in-depth FI articles

No existing article focused on this project has been verified.

Verification scope and classification notes
  • Editorial classification of the purpose described in official sources; not necessarily the operator's formal classification.
  • Matched to existing public company IDs. Roles are limited to those supported by the cited official sources.
  • No item was verified in this review. This does not establish that none exists or that it is undisclosed.

Official project information ↗

Sources for project information

Last verified: 2026/10/12 20:28:19 (Japan time)

Explore and compare projects worldwide →

Research and development purpose

Study simultaneous particle confinement and plasma stability by optimizing a helical-axis heliotron magnetic field.

Research stages, achievements, announced targets and technical specifications are organized in the project profile above. Check the sources for each item.

Focus: Optimizes helical-axis heliotron fields to combine particle confinement and plasma stability. Reading perspective: R&D purpose: optimize helical-axis heliotron fields for both particle confinement and plasma stability. Stages, results, targets and specs are in the project profile above…
Diagram summarizing the article’s key points.Diagram: FUSION INDUSTRY

Official information from related companies and research institutions

Check each organization’s announcements for development progress and technical documentation.

Check the official information

Share this article