About the data
COMPANIES

What does this company build?

Discover the work behind fusion. Explore and compare companies.

Companies in Japan 118 companiesCompanies in Japan and abroad 183 companies

Compiled from official public information. Association membership is distinguished from equipment supply and delivery records.

2 entries(1〜2件)

Compare companies (up to 3)

This is not a technical assessment or recommendation ranking.

Company nameLocationTechnologies / productsEvidence of involvementLast checked
Hitachi, Ltd.

Manufactures and delivers power supplies and superconducting coils for fusion research. Participates in ITER-related equipment development and construction and modification of the Large Helical Device, and developed a divertor prototype with QST.

TokyoUltra-high-voltage power supplies・Neutral-beam injection・Superconducting coils・Divertor団体会員・供給・納入実績2026-10-12
Mitsubishi Electric

An electrical manufacturer producing ITER TF-coil winding packs and large superconducting coils for JT-60SA. In 2025 it completed two 8-m-diameter copper FPPC coils with QST, extending its manufacturing record from magnetic-field generation to in-vessel plasma-position control.

TokyoSuperconducting coils・Toroidal-field coils団体会員・供給・納入実績2026-10-12

Hitachi, Ltd.

Manufactures and delivers power supplies and superconducting coils for fusion research. Participates in ITER-related equipment development and construction and modification of the Large Helical Device, and developed a divertor prototype with QST.

Location
Tokyo
Technology field
Ultra-high-voltage power supplies・Neutral-beam injection・Superconducting coils・Divertor
Evidence of involvement
団体会員・供給・納入実績
Last checked
2026-10-12

Mitsubishi Electric Corporation

An electrical manufacturer producing ITER TF-coil winding packs and large superconducting coils for JT-60SA. In 2025 it completed two 8-m-diameter copper FPPC coils with QST, extending its manufacturing record from magnetic-field generation to in-vessel plasma-position control.

Location
Tokyo
Technology field
Superconducting coils・Toroidal-field coils
Evidence of involvement
団体会員・供給・納入実績
Last checked
2026-10-12
Listed Japanese companies by technology field

Companies active in several fields are counted in each field. Companies with unconfirmed fields are excluded from these counts.