About the data
COMPANIES

What does this company build?

Discover the work behind fusion. Explore and compare companies.

Companies in Japan 118 companiesCompanies in Japan and abroad 183 companies

Compiled from official public information. Association membership is distinguished from equipment supply and delivery records.

5 entries(1〜5件)

Compare companies (up to 3)

This is not a technical assessment or recommendation ranking.

Company nameLocationTechnologies / productsEvidence of involvementLast checked
Kyoto Fusioneering

From heating-equipment deliveries to integrated fuel-cycle and heat-recovery testing: what UNITY sites test and how the company connects reactor developers with manufacturers.

TokyoPlasma heating・Fuel cycle・Blanket団体会員・技術開発2026-10-12
Canon Electron Tubes & Devices

A specialist manufacturer of gyrotrons, high-power microwave sources for fusion plasma heating. Working with QST, it supported supply of eight ITER units and manufactures tubes for the additional 20 announced in 2026, meeting the 1.2 MW requirement.

Tochigi PrefecturePlasma heating・Gyrotron団体会員・技術開発2026-10-12
Beam for Fusion Co., Ltd.

Applies ion-source and high-energy, high-current beam technologies to fusion and neutron sources. Its stated businesses include fusion-plasma design and the design and manufacture of plasma-heating equipment, particularly neutral-beam systems.

Gifu PrefectureNBI・Plasma heating団体会員・技術開発2026-10-12
Metal Technology Co., Ltd.

Provides heat treatment, joining and additive manufacturing of metal components. Developed a broadband millimeter-wave polarizer for JT-60SA electron-cyclotron resonance heating through joint research with QST and Ibaraki University.

TokyoPlasma heating・Metal joining団体会員・共同研究2026-10-12
Tokyo Electronics Co., Ltd.

An electronics company based on extreme-high-vacuum and pulsed-power technologies. Manufactures high-voltage pulsed power supplies for fusion gyrotrons. Its official product page reports deliveries to ITER and fusion research facilities overseas.

TokyoPower supplies・Plasma heating団体会員・供給・納入実績2026-10-12

Kyoto Fusioneering Ltd.

From heating-equipment deliveries to integrated fuel-cycle and heat-recovery testing: what UNITY sites test and how the company connects reactor developers with manufacturers.

Location
Tokyo
Technology field
Plasma heating・Fuel cycle・Blanket
Evidence of involvement
団体会員・技術開発
Last checked
2026-10-12

Canon Electron Tubes & Devices Co., Ltd.

A specialist manufacturer of gyrotrons, high-power microwave sources for fusion plasma heating. Working with QST, it supported supply of eight ITER units and manufactures tubes for the additional 20 announced in 2026, meeting the 1.2 MW requirement.

Location
Tochigi Prefecture
Technology field
Plasma heating・Gyrotron
Evidence of involvement
団体会員・技術開発
Last checked
2026-10-12

Beam for Fusion Co., Ltd.

Applies ion-source and high-energy, high-current beam technologies to fusion and neutron sources. Its stated businesses include fusion-plasma design and the design and manufacture of plasma-heating equipment, particularly neutral-beam systems.

Location
Gifu Prefecture
Technology field
NBI・Plasma heating
Evidence of involvement
団体会員・技術開発
Last checked
2026-10-12

Metal Technology Co., Ltd.

Provides heat treatment, joining and additive manufacturing of metal components. Developed a broadband millimeter-wave polarizer for JT-60SA electron-cyclotron resonance heating through joint research with QST and Ibaraki University.

Location
Tokyo
Technology field
Plasma heating・Metal joining
Evidence of involvement
団体会員・共同研究
Last checked
2026-10-12

Tokyo Electronics Co., Ltd.

An electronics company based on extreme-high-vacuum and pulsed-power technologies. Manufactures high-voltage pulsed power supplies for fusion gyrotrons. Its official product page reports deliveries to ITER and fusion research facilities overseas.

Location
Tokyo
Technology field
Power supplies・Plasma heating
Evidence of involvement
団体会員・供給・納入実績
Last checked
2026-10-12
Listed Japanese companies by technology field

Companies active in several fields are counted in each field. Companies with unconfirmed fields are excluded from these counts.