About the data
FUSION SUPPLY CHAIN

Where could your technology contribute?

Find equipment, materials and services by function, then explore related technologies and companies.

01 Create the plasma

Heating, power supplies, vacuum, measurement and control

02 Confine and extract

Superconductors, magnets, materials and blankets

03 Support the power plant

Fuel cycles, heat exchange, construction and maintenance

191 entries (showing 61–72)
名称 / 役割Country / regionApproach確認状況
ITER Organization
International research organization

The intergovernmental organization integrating ITER in France. Understand its seven Members, in-kind procurement, burning-plasma goals, cryogenics, remote maintenance and the difference between Q = 10 and electricity generation.

France (location) / international organizationMagnetic confinement / tokamak (ITER)
2026-10-07
NearStar Fusion
Companies

NearStar Fusion develops magnetized-target impact fusion using a railgun, deuterium fuel capsules and a modular reaction chamber. Its proposed repeated-operation power plant remains distinct from demonstrated net electricity.

——
2026-10-07
Type One Energy
Companies

Founded in 2019, this US company develops HTS stellarators as an OEM for utilities. Infinity One engineering validation and the Infinity Two power-plant concept address distinct stages, with heat exhaust and fuel-cycle integration still central challenges.

——
2026-10-07
Proxima Fusion
Companies

A 2023 German IPP spinout developing quasi-isodynamic stellarators and HTS coils. SMC, Alpha and the future Stellaris power-plant concept address different development stages; cooperation with Japanese suppliers is distinct from demonstrated electricity generation.

——
2026-10-07
B.A.U.M. Consult Japan Co., Ltd.
Company

A Japanese-German joint venture providing environmental and energy consulting. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
Faraday Factory Japan LLC
Company

A Japanese limited-liability company researching, developing, manufacturing and selling high-temperature superconducting wire. Official company information reports the adoption of its HTS wire in a compact fusion-reactor prototype. The specific device and delivery timing have not been verified in this dataset.

Japan—
2026-10-07
JFE Engineering Corporation
Company

Designs, builds and operates energy facilities, environmental plants and social infrastructure. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
KDDI Corporation
Company

A telecommunications company. A J-Fusion member; specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
NGK Corporation
Company

Supplies insulators, industrial ceramics and materials for electronic components. Its former name was NGK Insulators, Ltd. Listed as a full member in J-Fusion's official membership directory.Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
NTT, Inc.
Company

An NTT Group company providing information and communications services and related research and development. Listed as a special member in J-Fusion's official membership directory.Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
PwC Advisory LLC
Company

A Japanese advisory firm supporting mergers and acquisitions, corporate restructuring and business turnaround. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07
PwC Consulting LLC
Company

A Japanese consulting firm supporting the formulation and execution of business strategies. Listed as a supporting member of J-Fusion. Specific fusion-equipment deliveries and demonstration results have not been verified in this dataset.

Japan—
2026-10-07